6 Commissioning
| Commissioning with the SIMATIC Manager (PROFINET)
26
2547720000/03/09.2019
Manual Communication module UR20-4COM-IO-LINK
Adding IO-Link master in SIMATIC Manager (Example: PROFINET)
Parameterising IO-Link port with SIMATIC Manager
The IO-Link ports are parameterised using the IO-Link master
parameters. An overview of all parameters is presented in
▶
Double-click the module in the module list.
The
UR20-4COM-IO-LINK
Properties window
opens.
▶
Select the
Parameters
tab
The list of all parameters is displayed.
Editing module parameters
▶
Click the parameter that you would like to change and
select the desired setting.
▶
Use this method to edit all of the parameters that you
want to change.
▶
Click
OK
to save the settings.
All settings only take effect once they have been
loaded into the component.
Integrating IO-Link device with SIMATIC Manager
An IO-Link device is integrated using the suitable parameteri-
zation of the associated IO-Link port.
▶
Double-click the module in the module list.
The
UR20-4COM-IO-LINK
Properties window
opens.
▶
Select the
Parameters
tab.
▶
Set the “Operating mode” parameter of the IO-Link port to
the value “IO-Link”.
▶
Set each of the parameters “Process data length input”
and “Process data length output” to the value “auto”.
▶
Change the other parameters as required.
▶
Save the setting by clicking
OK
.
All settings only take effect once they have been
loaded into the component.
Содержание UR20 Series
Страница 1: ...Remote I O System u remote UR20 Communication module UR20 4COM IO LINK Manual Let s connect...
Страница 8: ...8 2547720000 03 09 2019 Manual Communication module UR20 4COM IO LINK...
Страница 10: ...10 2547720000 03 09 2019 Manual Communication module UR20 4COM IO LINK...
Страница 20: ...20 2547720000 03 09 2019 Manual Communication module UR20 4COM IO LINK...
Страница 48: ...48 2547720000 03 09 2019 Manual Communication module UR20 4COM IO LINK...
Страница 54: ...54 2547720000 03 09 2019 Manual Communication module UR20 4COM IO LINK...