![Wacker Neuson E3000 Скачать руководство пользователя страница 74](http://html2.mh-extra.com/html/wacker-neuson/e3000/e3000_operators-manual_3125736074.webp)
wc_tx001951gb.fm
74
Operation
E 3000
Ignition
carryover
The ignition carryover state starts as soon as the flame is established.
During this state:
The fuel shut-off valve is open (energized).
Pressurized fuel atomizes at the burner nozzle.
The atomized fuel is ignited by the electrodes.
The electrodes stay powered for up to 10 seconds after flame is
sensed.
When the ignition carryover state has elapsed:
The ignition transformer is shut off.
The burner control enters the run state.
If the flame is lost during the ignition carryover state:
If the lockout time has not expired, the burner control returns to trial-
for-ignition state.
If the lockout time has expired, the burner control enters the recycle
mode.
Run
The run state starts and continues once the ignition carryover state has
elapsed. During this state:
The fuel shut-off valve is open (energized).
Pressurized fuel atomizes at the burner nozzle.
The flame is monitored by the cad cell.
When the setpoint is reached (call for heat satisfied), the burner control
enters the burner-motor-off delay state.
If the flame is lost during the run state:
The burner control enters the recycle mode.
Burner-motor-
off-delay
The burner-motor-off-delay state starts immediately after the setpoint is
reached, i.e., the call for heat has been satisfied. The time of this state
is 30 seconds. During this state:
The output contacts of the temperature controller open, interrupting
the circuit between terminals labeled “T”.
The fuel shut-off valve closes (de-energizes).
The burner motor runs until the burner-motor-off delay expires, then
the burner motor turns off.
The burner control returns to the idle mode.
If the cad cell detects flame during the burner-motor-off-delay state:
The burner control goes into the standby state.
State
Action or Function
Содержание E3000
Страница 6: ...Foreword wc_tx002028gb fm 6...
Страница 22: ...Labels E 3000 wc_si000643gb fm 22 2 Labels 2 1 Label Locations 603 wc_gr008850 998 608 626 602 601 999 618...
Страница 39: ...ghi_tx001160gb fm 39 E 3000 Lifting and Transporting Notes...
Страница 44: ...wc_tx001951gb fm 44 Operation E 3000 4 5 Control Panel wc_gr008606 1 2 n d e f g h i j k l m a b c o p...
Страница 77: ...wc_tx001951gb fm 77 E 3000 Operation Notes...
Страница 95: ...ghi_tx001162gb fm 95 E 3000 Accessories wc_gr008559 2 1 1 2 x z a b c LR RR RS LS HX 50 HX 50 HX 50...
Страница 97: ...ghi_tx001162gb fm 97 E 3000 Accessories wc_gr008560 a b LR RR RS LS HX 50 HX 50...
Страница 99: ...ghi_tx001162gb fm 99 E 3000 Accessories wc_gr008561 a LR LS HX 50...
Страница 101: ...ghi_tx001162gb fm 101 E 3000 Accessories wc_gr008580 SPP HX 100 HX 100 HX 100 d e a b c LR RR y LS RS APP 2 1...
Страница 103: ...ghi_tx001162gb fm 103 E 3000 Accessories wc_gr008582 HX 100 HX 100 a b LR RR LS RS...
Страница 105: ...ghi_tx001162gb fm 105 E 3000 Accessories wc_gr008583 HX 100 a LR LS...
Страница 107: ...ghi_tx001162gb fm 107 E 3000 Accessories wc_gr008584 APP c e d DPP a b LR LS RR RS 2 1 HX 200 HX 200...
Страница 182: ...MSDS Dowfrost HD 50...
Страница 186: ...wc_tx001673gb fm 186 Fuji Temperature Controller...
Страница 199: ...Tire Safety Information...
Страница 200: ...wc_tx001952gb fm 200 Schematics E 3000 12 Schematics 12 1 Composite Schematic Machine with Oil Burner...
Страница 201: ...wc_tx001952gb fm 201 E 3000 Schematics 12 2 Composite Schematic Machine with Gas Burner...
Страница 205: ...wc_tx001952gb fm 205 E 3000 Schematics 12 4 Circulation System Circuit...
Страница 206: ...wc_tx001952gb fm 206 Schematics E 3000 12 5 Rewind System Circuit...
Страница 207: ...wc_tx001952gb fm 207 E 3000 Schematics 12 6 Gas Train Schematic...
Страница 208: ...wc_tx001952gb fm 208 Schematics E 3000 12 7 Generator...
Страница 213: ......