wc_tx002070gb.fm
122
Burner Setup—Gas
E 3000
7.3
Setting up the Burner
Background
The burner consists of several different components and subsystems. Each of
these components or subsystems must be operating correctly for the burner to
function properly.
Tools required
The following tools are required to adjust the burner:
High-quality combustion analyzer
Smoke spot tester
Manometer
General hand tools
Mandates
Adjustments made shall be done so that the machine conforms to the
requirements of local, state, and federal codes and authorities.
Adjustments shall be made at the job site.
When to
adjust
Adjust the burner:
Before operating the machine at elevations 305 m (1,000 ft) above or below the
location of where the last adjustments were made
Before starting at a new job site
After any burner maintenance or repair has been performed
If burner performance is in question
Procedure
Follow the procedure below to set up the burner.
1. Shut down the machine.
2. Adjust the ionization probe and the electrode.
(See topic 7.4)
3. Check the burner orifice.
(See topic 7.5)
4. Set the air settings.
(See topic 7.6)
5. Adjust the head setting.
(See topic 7.7)
6. Check/set the supply gas pressure.
(See topic 7.8)
7. Start the machine and the burner.
8. Check/set the burner gas pressure.
(See topic 7.9)
This procedure continues on the next page.
Содержание E3000
Страница 6: ...Foreword wc_tx002028gb fm 6...
Страница 22: ...Labels E 3000 wc_si000643gb fm 22 2 Labels 2 1 Label Locations 603 wc_gr008850 998 608 626 602 601 999 618...
Страница 39: ...ghi_tx001160gb fm 39 E 3000 Lifting and Transporting Notes...
Страница 44: ...wc_tx001951gb fm 44 Operation E 3000 4 5 Control Panel wc_gr008606 1 2 n d e f g h i j k l m a b c o p...
Страница 77: ...wc_tx001951gb fm 77 E 3000 Operation Notes...
Страница 95: ...ghi_tx001162gb fm 95 E 3000 Accessories wc_gr008559 2 1 1 2 x z a b c LR RR RS LS HX 50 HX 50 HX 50...
Страница 97: ...ghi_tx001162gb fm 97 E 3000 Accessories wc_gr008560 a b LR RR RS LS HX 50 HX 50...
Страница 99: ...ghi_tx001162gb fm 99 E 3000 Accessories wc_gr008561 a LR LS HX 50...
Страница 101: ...ghi_tx001162gb fm 101 E 3000 Accessories wc_gr008580 SPP HX 100 HX 100 HX 100 d e a b c LR RR y LS RS APP 2 1...
Страница 103: ...ghi_tx001162gb fm 103 E 3000 Accessories wc_gr008582 HX 100 HX 100 a b LR RR LS RS...
Страница 105: ...ghi_tx001162gb fm 105 E 3000 Accessories wc_gr008583 HX 100 a LR LS...
Страница 107: ...ghi_tx001162gb fm 107 E 3000 Accessories wc_gr008584 APP c e d DPP a b LR LS RR RS 2 1 HX 200 HX 200...
Страница 182: ...MSDS Dowfrost HD 50...
Страница 186: ...wc_tx001673gb fm 186 Fuji Temperature Controller...
Страница 199: ...Tire Safety Information...
Страница 200: ...wc_tx001952gb fm 200 Schematics E 3000 12 Schematics 12 1 Composite Schematic Machine with Oil Burner...
Страница 201: ...wc_tx001952gb fm 201 E 3000 Schematics 12 2 Composite Schematic Machine with Gas Burner...
Страница 205: ...wc_tx001952gb fm 205 E 3000 Schematics 12 4 Circulation System Circuit...
Страница 206: ...wc_tx001952gb fm 206 Schematics E 3000 12 5 Rewind System Circuit...
Страница 207: ...wc_tx001952gb fm 207 E 3000 Schematics 12 6 Gas Train Schematic...
Страница 208: ...wc_tx001952gb fm 208 Schematics E 3000 12 7 Generator...
Страница 213: ......