![Wacker Neuson DT08-D Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/wacker-neuson/dt08-d/dt08-d_operators-manual_3233099034.webp)
3-4
BA DT08 SL EN – Edition 1.0 * * dt08b320.fm
Operation
3.3
Putting into operation
Safety instructions
• Always face the machine as you get on and off the machine
• Never use the controls or movable lines and cables as handles
• Never get on or off a moving machine! Never jump off the machine
Putting the machine into operation for the first time
Important information
• The machine may be put into operation by authorised staff only
Selection and qualification of staff, basic responsibilities
on page 2-1 of this Operator’s Manual.
• The staff must have read and understood this Operator’s Manual before putting the
machine into operation
• The machine may only be used in technically perfect condition in accordance with its
designated use and the instructions set forth in the Operator’s Manual, and only by
safety-conscious persons who are fully aware of the risks involved in operating the
machine
• Go through the “Start-up” checklist in the following chapter
Running-in period
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
• Do not overload the machine, but at the same time do not drive too cautiously either, as
the machine will never reach its proper operating temperature
• Do not run the engine at high speed for extended periods
• Increase the load gradually whilst varying the engine speed
• Strictly observe the maintenance schedules in the appendix
Maintenance plan DT08-P (petrol engine)