5-26
BA DT08 SL EN – Edition 1.0 * * dt08b540.fm
Maintenance
Check tracks fo
r cracks and cuts
●●
Check track tension. Retighte
n if necessary
●●
Bearing play
of tread rollers, t
rac
k carrier rolle
rs, front idlers
●●
Check piston rods
for damage
●●
Check screws for tightness
●●
●
Pin lock
●●
Lin
e fixtures
●●
Adhesive labels and Operator’s Manual
●●
●
Lubrication service (
):
Lubricate the following assemblies/
comp
onents
Lubrication plan DT08 with skip
:
•S
ki
p
●●
•
Tilt r
am
●●
•
Loader unit (option)
●●
•
Loader unit rams (option)
●●
•
Track tension
●●
•
Track roller bearings
●●
Leakage check (
):
Check for tightness, leaks and chafing: p
ipes, flexible lines and screw connections of
the following assemblies and compo
nents.
Recti
fy if nec
essary:
•
Visual check
●●
☞
Engine and
hydraulic system
●●
☞
Oil co
oling circuit
●●
☞
Trave
lling drive
●●
1.
Repl
ac
e
the
engine oil the
firs
t tim
e after
20 s/h or the fi
rs
t m
onth,
th
en every 1
00 s/h or
after 6
m
onth
s
at the
latest
2.
Repl
ac
e the fuel
filte
r th
e first
tim
e
after 5
0 s/h
, the
n every 40
0 s/h
5.10
Maintenance plan DT08-P (petrol engine)
Work description
For service a
nd maintenance work on
the attachment,
please refer to the op
eration and maintenance man
ual
of the attachment manuf
acturer as well.
Maintenance plan/s
ervic
e hours (s/h)
Service work
(daily)
Every 20 s/h
Every 50 s/h
Every 100 s/h
300 s/h
Every 1000 s/h
once a year
Customer
Authorised
workshop