![Wacker Neuson DT08-D Скачать руководство пользователя страница 85](http://html1.mh-extra.com/html/wacker-neuson/dt08-d/dt08-d_operators-manual_3233099085.webp)
BA DT08 SL EN – Edition 1.0 * * dt08b540.fm
5-25
Maintenance
5.10
Maintenance plan DT08-P (petrol engine)
Work description
For service a
nd maintenance work on
the attachment,
please refer to the op
eration and maintenance man
ual
of the attachment manuf
acturer as well.
Maintenance plan/s
ervic
e hours (s/h)
Service work
(daily)
Every 20 s/h
Every 50 s/h
Every 100 s/h
300 s/h
Every 1000 s/h
once a year
Customer
Authorised
workshop
Fluid and filter changes (
):
Carry out the following oil and filter changes (check oil levels after test run):
•
Engine oil
1
●●
●
•
Fuel filter
2
●●
●
•
H
ydr
aulic
oi
l fil
ter ins
ert
●●
●
•
H
ydr
aulic
oi
l
●●
•
R
eplace the air filter element
●●
•
H
ydraulic o
il tank breather
●●
•
R
eplace the spa
rk plu
g
●●
Inspection work (
):
Check the following materi
al. Refill if necessary:
Check the fuel level, fill up fuel
●●
•
Engine oil
●●
•
H
ydr
aulic
oi
l
●●
Clean the filte
r cup
●●
Check hydraulic oil radiator
fo
r dirt, clean if necessary
●●
Check oil cooling systems
and
hoses for leaks and
pressure (visual check)
●●
Air filter (damage)
●●
Check exhau
st system for damage and condition
●●
Check valve clearance, adjust if necessary
●●
Check and clean the spark plug
●●
Check/set idling speed
●●
Empty the petrol tank
●●
Check battery electrolyte
. Fill up
with distilled water if necessary
●●
●
Che
ck a
lte
rnat
or, sta
rte
r an
d e
le
ct
ric conne
ct
io
ns, b
earing p
la
y
and
fun
ct
io
n
●●
Pressure check of
primar
y pressure limiting valves
●●
●