C H A P T E R 5
–
G E T T I N G S T A R T E D
AT5600 User Manual 98-119 issue 14
Page 66
In the lower left window, s
elect the tab labeled 'General Tests’.
Next, double
click the left mouse button on the
‘R Winding Resistance’ from the ‘Available
Tests’ window.
The following dialogue box will appear.
E
nter the terminal names. Input ‘A’ as the high terminal and ‘B’ as
the low
terminal, moving between the fill-in boxes using the TAB key or right clicking in
the desire box.
Now enter the resistance limits. This can be done in four ways:
%
Click on this button to enter a nominal value with a percentage
tolerance (for example, 190 m
with 10% tolerance),
><
Click on this button to enter minimum and maximum values (for
example, 171 m
and 209 m
)
>
Click to enter just a minimum value (for example, > 171 m
),
<
Click to enter just a maximum value (for example < 209 m
).
Содержание AT5600
Страница 10: ...AT5600 User Manual 98 119 issue 14 Page 10 16 4 AT Series Server Software 437...
Страница 39: ...C H A P T E R 2 S Y S T E M O V E R V I E W AT5600 User Manual 98 119 issue 14 Page 39...
Страница 88: ...C H A P T E R 6 S A F E T Y S Y S T E M S AT5600 User Manual 98 119 issue 14 Page 88...
Страница 168: ...C H A P T E R 7 T E S T S A N D T E S T C O N D I T I O N S AT5600 User Manual 98 119 issue 14 Page 168...
Страница 198: ...C H A P T E R 8 F R O N T P A N E L O P E R A T I O N AT5600 User Manual 98 119 issue 14 Page 198...
Страница 204: ...C H A P T E R 9 T R O U B L E S H O O T I N G AT5600 User Manual 98 119 issue 14 Page 204...
Страница 252: ...C H A P T E R 1 0 S P E C I F I C A T I O N S AT5600 User Manual 98 119 issue 14 Page 252...
Страница 258: ...C H A P T E R 1 2 W A R R A N T Y A N D S E R V I C E AT5600 User Manual 98 119 issue 14 Page 258...
Страница 270: ...C H A P T E R 1 3 T E S T F I X T U R E S AT5600 User Manual 98 119 issue 14 Page 270...