Fig. 35
Fig. 34
Fig. 33
18
Versa Lift
ASSEMBLY GUIDE
(All Models)
USE THE RE MOTE CONTROL
TO RAISE THE PLATFORM
TO THE HIGHEST POSITION.
(POWER)
KEY
UP
DOWN
SWITCH
ROCKER
SWITCH
STANDARD REMOTE
“DOWN”
SWITCH
“UP”
SWITCH
WIRELESS REMOTE
POWER
CORD
MAIN POWER SWITCH
(Wireless Models Only)
WASHER (4)
1/4 x 5/8"
½ x 1" SPACER (4)
1/4-20 x 1-1/2" PHILLIPS (4)
1/4" LOCK-
NUT (4)
CENTER MARK OF
OPENING (SEE FIG. 4)
PUSH SLOTTED MOUNTING RAILS
TOWARD THE PLATFORM UNTIL THE
PLATFORM CENTER MARKS LINE UP
WITH THE OPENING CENTER MARKS,
MOVING LEFT OR RIGHT AS NEEDED,
THEN TIGHTEN THE (8) LAG SCREWS.
MARK THE
CENTER OF
PLATFORM
SLOTTED
MOUNTING
RAILS (2)
INSTALL (4) PLATFORM
GUIDE SPACERS AT
FOUR CORNERS
9. RAISE THE LIFTING PLATFORM
Before proceeding, review the first 8 steps to make sure
you haven’t missed any assembly steps. All of the bolts
must be tight
except the lag screws
that hold the
mounting rails to the deck. These must be loose enough
that the rails can move freely the distance that the slotted
holes allow. After reviewing steps 1-8, proceed as follows:
9-1.
Make sure the corded remote and power cord hang
freely from the rear of the lift motor and are not wrapped
around the housing, the legs or the motor (Fig. 33).
9-2.
Make sure the key switch (Standard) or the power
switch (Wireless) is in the “OFF” position, then plug in the
power cord (Fig. 33).
9-3.
Stand clear of the lift mechanism and keep your
hands clear too. Turn the key or power switch to “ON.”
Jog the “UP” direction switch (Fig. 33 insets) and watch
as the platform comes up. When the platform nears the
opening, jog (bump) the “UP” direction switch to move
the platform in small increments, watching to make sure
that it does not catch or bind on the opening. (If it hangs
or binds, turn the key or power switch to off and unplug
the power cord, then look to see what the problem is.
Correct any problems before continuing the operation.)
9-4.
When the platform reaches its upper limit, the upper
limit switch will stop the motor and stop the platform.
Turn off the key or power switch and unplug the
power cord before proceeding to the next step.
10. INSTALL THE PLATFORM GUIDE SPACERS
Locate the 4 screws, spacers, washers and locknuts
shown in Fig. 34 inset. Install the spacer into the hole in
the mounting rail between the housing legs and the
platform legs. Tighten each screw firmly. These spacers
guide the platform to the center of the opening in one
direction, the mounting rails will guide the platform in the
other direction.
11. ADJUST THE MOUNTING RAILS
Carefully measure 22” in from either end of the lifting
platform and make a small mark perpendicular to the
edge (Fig. 35). This is the center of the platform. The
mounting rails are slotted so that they can be adjusted to
guide the platform to the center of the opening where you
made a center mark earlier, when preparing the opening
(Fig. 4, Pg. 5). Push the mounting rails towards the
center, moving the platform left or right until the center
marks are aligned.
First,
tighten the lag screws firmly on
the first mounting rail, but do not over-tighten them and
strip the threads in the floor.
Second,
tighten the second
mounting rail lag screws as above, but leave a little space
between the mounting rail and the platform legs (note: a
business card folded double makes a good gage).
Congratulations! Your installation is now complete!
Please read and understand the
Owners Manual
completely to learn important safety rules you
need to know before operating this lift system!
WAR
NIN
G
!
Kee
p
ren!
out o
f reac
h of child
Turn
use!
Lift o
f f whe
n not in
UNPLUG POWER CORD BEFORE
PROCEEDING TO THE NEXT STEP.
WARNING:
KEEP AWAY FROM
THE LIFT HOUSING AND LIFT
PLATFORM WHEN OPERATING!