Installation
34
LFXG-H Installation and Operation Guide
Table 2.1
Conduit Torque Specifications
Table 2.2
GEN2000 Adapter and Plugs
Wiring
Use the drawing notes and the steps that follow to make the input and
output connections. Make the connections at the removable terminal strips
mounted on the power board. To access the power board, remove the
explosion-proof housing cap.
Normal Size of Conduit
Torque
Inches
lb/ft
(N/m)
1/2, 3/4
67
(90)
1, 1-1/4 and 1-1/2
83
(113)
Millimeters
lb/ft
(N/m)
M16 & M20
23.9
(32.5)
Part Number
Description
Material
Plugs
221710
3/4
"
NPT Pipe Plug
Galvanized
221716
3/4
"
NPT Pipe Plug SQ HD
316SS
EEXD Approved
2.36361
1/2
"
NPT Pipe Plug
Aluminum
2.44134
3/4
"
NPT Pipe Plug
316SS
246681
M20 x 1.5 Stop Pipe Plug
Brass
Adapters
EEXD Approved
248000
3/4
"
NPT to 1/2
"
NPT
Brass/unplated
247184
3/4
"
NPT to M20 x 1.5
Brass/unplated
2.41660
3/4
"
NPT to M20 x 1.5
316SS
Note:
If you received an interconnect drawing from VEGA or the
engineering contractor and the instructions differ from the
instructions in this manual, use the drawing. It may contain
special instructions specific to your order.
Содержание FiberFlex LFXG-H
Страница 2: ......
Страница 4: ...ii LFXG H Installation and Operation Guide NOTES...
Страница 6: ...iv LFXG H Installation and Operation Guide...
Страница 14: ...Preface xii LFXG H Installation and Operation Guide...
Страница 34: ...Installation 32 LFXG H Installation and Operation Guide FiberFlex mounting...
Страница 91: ...Diagnostics and repair LFXG H Installation and Operation Guide 89 Source Functions...
Страница 100: ...98 LSGH Installation and Operation Guide NOTES...
Страница 101: ......