Installation
LFXG-H Installation and Operation Guide
39
Conduit
Conduit runs must be continuous and you must provide protection to
prevent conduit moisture condensation from dripping into any housings or
junction boxes. Use sealant in the conduit, or arrange the runs so they are
below the entries to the housings and use weep holes where permitted.
You must use a conduit seal-off near the housing when located in a
hazardous area. Distance must comply with local code.
If you use only one conduit hub, plug the other one to prevent dirt and moisture
from entering.
Commissioning the gauge
Depending on the source holder’s type, the process of commissioning the
gauge can include:
• Taking appropriate radiation field tests
• Checking the pre-programmed setup parameters
• Calibrating on process
• Verifying the working of the gauge
You must remove the source holder lock or shield the first time the gauge
takes measurements in the field. Only persons with a specific license from
the U.S. NRC, Agreement State, or other nuclear regulatory body may
remove the source holder lock.
Note:
Users outside the U.S. must comply with the appropriate
nuclear regulatory body’s regulations in matters pertaining to
licensing and handling the equipment.
Note:
See the Radiation Safety for U.S. General and Specific
Licensees, Canadian and International Users Manual and the
Radiation Safety Manual Addendum of Reference Information
CD that came with the source holder and the appropriate
current regulations for details.
Содержание FiberFlex LFXG-H
Страница 2: ......
Страница 4: ...ii LFXG H Installation and Operation Guide NOTES...
Страница 6: ...iv LFXG H Installation and Operation Guide...
Страница 14: ...Preface xii LFXG H Installation and Operation Guide...
Страница 34: ...Installation 32 LFXG H Installation and Operation Guide FiberFlex mounting...
Страница 91: ...Diagnostics and repair LFXG H Installation and Operation Guide 89 Source Functions...
Страница 100: ...98 LSGH Installation and Operation Guide NOTES...
Страница 101: ......