Installation
28
LFXG-H Installation and Operation Guide
You can calibrate the current loop output on the bench before mounting the
detector on the process. See 43.
Note:
You may need to reset the time and date if the gauge has not
had power for > 28 days. The Real Time Clock Fail message
may appear. You must enter the correct time and date: the clock
is the basis for source decay calculations.
GEN2000 terminals 13 and 14
250 – 800
load resistor (optional)
Mini clips
HART modem
RS-232 cable
PC running
VEGA software
Transmitter
test points
H1
H2
Bench test setup
Содержание FiberFlex LFXG-H
Страница 2: ......
Страница 4: ...ii LFXG H Installation and Operation Guide NOTES...
Страница 6: ...iv LFXG H Installation and Operation Guide...
Страница 14: ...Preface xii LFXG H Installation and Operation Guide...
Страница 34: ...Installation 32 LFXG H Installation and Operation Guide FiberFlex mounting...
Страница 91: ...Diagnostics and repair LFXG H Installation and Operation Guide 89 Source Functions...
Страница 100: ...98 LSGH Installation and Operation Guide NOTES...
Страница 101: ......