54 Rainger Linear
OPERATION
Center Inlet
Hose and Cord Positioning
The following instructions describe a basic method of positioning which includes how to position the hose and
optional electric cord for the single or double hose center inlet depending on direction of machine movement,
position of machine in relationship to the pipeline and power pedestals as the machine moves across the field.
1. Allow the linear cart to move past the end of the
hose approximately 50 ft (15.24 m). Stop the
system.
2. Connect the riser end of hose to the pipeline shut
off valve.
3. Connect the inlet end of hose to the center inlet
with circle lock ring. Attach chains from the soft
hose/poly hose connection to the anchor bracket
on each side of cart. See Figure 54-1.
• Temporarily installing a post approximately 6
ft (1.82 m) behind the linear cart and on the
pipeline side of the hose will aid in connecting
the hose to the center inlet. See Figure 54-2.
4. Set the end of field/hose stop post for the length
of the hose being used.
5. If using the optional electric cord drag:
(a) Make sure the power pedestal disconnect is
in the OFF position.
(b) Position the electric cord far enough away
from the hose, so that the hose will not drag
over it. To prevent interference between the
electric cord, cart tires and hose, position the
electric cord over the top of hose or when
applicable, bury the electric cord in the area
where interference will occur. See Figure
54-2.
(c) Connect the electric cord to the power ped-
estal.
(d) When ready, switch the power pedestal dis-
connect switch into the ON position.
2
4
5
6
3
1
7
8
Figure 54-2 1. First Hose
2. Shut Off Valve
3. Center Inlet
4. Temporary Post (optional)
5. Electric Cord
6. Power Pedestal
7. Alternate Power Pedestal Location and Electric Cord Position
8. Direction of Travel
1
2
4
5
4
3
Figure 54-1 1. Soft Hose
2. Center Inlet
3. Circle Lock Ring
4. Chain
5. Anchor Bracket
* Double Inlet Shown
!
CAUTION
• TO PREVENT THE OPTIONAL ELECTRIC
CORD FROM SNAGGING ON THE TEMPO-
RARY POST, REMOVE THE TEMPORARY
POST IMMEDIATELY AFTER CONNECTING
THE HOSE.
Содержание Rainger Linear
Страница 2: ...2 Rainger Linear This page was left blank intentionally...
Страница 6: ...6 Rainger Linear TABLE OF CONTENTS This page was left blank intentionally...
Страница 36: ...36 Rainger Linear OPERATION This page was left blank intentionally...
Страница 58: ...58 Rainger Linear OPERATION This page was left blank intentionally...