![Valley Rainger Linear Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/valley/rainger-linear/rainger-linear_owners-manual_3240098051.webp)
Rainger Linear 51
OPERATION
Side Inlet
Hose and Cord Positioning (continued)
6. As the machine approaches the end of field/hose stop post, Stop the machine and close the water shut off
valve for the hose.
7. Disconnect the first hose from the pipeline shut off valve so that water from the hose drains away from the
cart path.
• If more than one hose is being used, disconnect first hose from side inlet. Connect second hose to next
pipeline shut off valve, position second hose, connect and secure to side inlet. See Figure 51-1.
• If only one hose is being used, reposition the hose and connect to the next pipeline shutoff valve.
8. Reposition the end of field/hose stop for the length of the hose being used.
9. If using the optional electric cord drag:
(a) Make sure the power pedestal disconnect is in the OFF position.
(b) Disconnect the electric cord from the power pedestal.
(c) Position the electric cord far enough away from the hose, so that the hose will not drag over it. To prevent
interference between the electric cord, cart tires and hose, bury the electric cord in the area where in-
terference will occur or when applicable, position the electric cord over the top of hose. See Figure 51-1.
(d) Make sure the second power pedestal disconnect is in the OFF position.
(e) Connect the electric cord to the second power pedestal.
(f) When ready, switch the second power pedestal disconnect switch into the ON position.
10. At the machine/control panel:
(a) Select the original direction of travel.
(b) Set the percentage timer to the desired application rate or speed.
(c) If applicable set the Auto Reverse/Auto Stop control as desired.
11. When ready, start the machine. If applicable, start pipeline pump and open the water shut off valve for the
hose. The machine should start and run in the desired direction and auto reverse or stop at the end of field/
hose stop post which was set for the length of the hose.
12. Repeat the steps 6-11 as needed to cross the field.
Riser
Guidance (Furrow or Cable)
Poly
14’
[4.27m]
(4”)
20’
[6.10m]
(6”)
16’
[4.88m]
(4-3/4”)
with Bumpers
Riser
Guidance (Furrow or Cable)
14’
[4.27m]
(4”)
20’
[6.10m]
(6”)
32’
[9.75m]
(8”)
16’
[4.88m]
(4-3/4”)
without Bumpers
centerline of Cart path
EOF to 1st riser =
poly length - 50 ft.
Intermediate riser spacing =
(2x poly length) - 80 ft.
Intermediate
Riser
Figure
2
5
8
1
4
7
3
6
5
10
9
Figure 51-1 1. First Hose
2. Second Hose
3. Shut Off Valve
4. Side Inlet
5. Hose Bumper (optional)
6. Electric Cord (optional)
7. Power Pedestal
8. Alternate Power Pedestal Location
9. Guidance Furrow or Cable
10. Direction of Travel
Содержание Rainger Linear
Страница 2: ...2 Rainger Linear This page was left blank intentionally...
Страница 6: ...6 Rainger Linear TABLE OF CONTENTS This page was left blank intentionally...
Страница 36: ...36 Rainger Linear OPERATION This page was left blank intentionally...
Страница 58: ...58 Rainger Linear OPERATION This page was left blank intentionally...