![Valley Rainger Linear Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/valley/rainger-linear/rainger-linear_owners-manual_3240098068.webp)
68 Rainger Linear
OPERATION
Open Delivery
Electric Cord Positioning (continued)
7. When ready, start the machine. If applicable, open the water shut off valve on the riser. The machine should
start and run in the desired direction and auto reverse or stop at the end of field stop post which was set
for the length of the electric cord.
8. Repeat the steps 6-11 as needed to cross the field.
9. As the machine approaches the edge of the field do one of the following:
• If Auto Reverse is on, monitor and assist the auto reverse process as needed, closing and opening the
riser valve as required.
(a) Reposition the end of field stop for the length of electric cord.
(b) The machine should start and run in the desired direction and stop at the end of field stop post which
was set for the length of the electric cord.
• If Auto Stop is on, monitor and assist the auto stop process as needed, closing the riser valve as required.
(a) If this is a standard linear machine continue with step 14 of this instruction to run machine back
across the field in the opposite direction.
(b) If this is a swing around linear machine and the operator intends to swing the machine around to
the other field, proceed to the Swing Around section, follow the Swing Around procedure and swing
the machine around to the other field. After swinging machine around, return to this instruction and
continue with step 14 to run machine back across the field in the opposite direction.
10. Reposition the end of field stop for the length of electric cord.
11. Move electric cord:
(a) Make sure the power pedestal disconnect,
that the electric cord is connected to, is in
the OFF position.
(b) Position the electric cord far enough away
from the hose, so that the hose will not drag
over it. To prevent interference between the
electric cord, cart tires and hose, bury the
electric cord in the area where interference
will occur or when applicable, position the
electric cord over the top of hose. See Figure
68-1.
(c) When ready, switch the power pedestal dis-
connect switch into the ON position.
12. At the machine/control panel:
(a) Select the desired direction of travel.
(b) Set the percentage timer to the desired ap-
plication rate.
(c) If applicable set the Auto Reverse/Auto Stop
control as desired.
13. When ready, start the machine. If applicable,
open the riser water shut off valve. The machine
should start and run in the desired direction and
auto reverse or stop at the end of field/hose stop
post which was set for the length of the hose.
14. Repeat the steps 6-11 as needed to cross the
field in the opposite direction.
Riser
Guidance (Furrow or Cable)
Poly
14’
[4.27m]
(4”)
20’
[6.10m]
(6”)
16’
[4.88m]
(4-3/4”)
with Bumpers
Riser
Guidance (Furrow or Cable)
14’
[4.27m]
(4”)
20’
[6.10m]
(6”)
32’
[9.75m]
(8”)
16’
[4.88m]
(4-3/4”)
without Bumpers
centerline of Cart path
EOF to 1st riser =
poly length - 50 ft.
Intermediate riser spacing =
(2x poly length) - 80 ft.
Intermediate
Riser
Figure
1
2
3
4
5
Figure 68-1 1. Power Pedestal
2. Electric Cord
3. Buried Cord
4. Direction of Travel
5. Furrow or Cable Guidance
Содержание Rainger Linear
Страница 2: ...2 Rainger Linear This page was left blank intentionally...
Страница 6: ...6 Rainger Linear TABLE OF CONTENTS This page was left blank intentionally...
Страница 36: ...36 Rainger Linear OPERATION This page was left blank intentionally...
Страница 58: ...58 Rainger Linear OPERATION This page was left blank intentionally...