A-4
Valco Cincinnati, Inc.
MC032 - MCP-25 Control
Appendix A - Maintenance Procedures
6-Month
Maintenance
Actions
Date
Shift
Initials
1. Flush entire glue system,
except for the central
pumping system
, with a vinegar and water solution
(1 gallon of vinegar to 10 gallons of water).
2. Perform the
“Weekly Maintenance” procedure.