13-3
Valco Cincinnati, Inc.
Section 13 - Operation
MC032 - MCP-25 Control
9.
Enter values for the pressure curves:
a.
Press the glue-pressure-edit-menu icon button.
b.
Enter the minimum production speed (at minimum pressure) in the field “V min.”
c.
Enter the maximum production speed (at maximum pressure) in the second field to
the right of “V.”
d.
Enter the minimum pressure (“P% min.”) (0-100%).
e.
Enter the maximum pressure in the second field to the right of “P.” (This value is
normally 100%.)
f.
Enter other speed and pressure values between the minimum and maximum settings
if desired.
g.
Program other pressure tables (2) if desired. You may use the copy button to copy a
pressure table to another location.
10. Complete pressure table 1:
a.
Return to pressure table 1 after entering values for other pressure tables.
b.
Operate the parent machine at slow speed (under 10 meters/minute).
c.
Press F5 (LEARN). The pressure points between the minimum and maximum
pressure will automatically be completed by the MCP-25.
11. Save the job:
a.
Press the job-management menu icon button.
b.
Press the “SAVE” button.
c.
Using the scroll buttons, enter a job name.