A-3
Valco Cincinnati, Inc.
MC032 - MCP-25 Control
Appendix A - Maintenance Procedures
3-Month
Maintenance
Actions
Date
Shift
Initials
1. Encoder mounting:
a. Check timing belt, gear and pulley teeth, and
proper timing belt tension..
b. If using measuring wheel, check for wear and
proper wheel tension on machine belt.
c. If using direct-drive encoder, check coupling
and rotation of shaft for proper alignment.
2. Perform the
“Weekly Maintenance” procedure.