9-5
Valco Cincinnati, Inc.
Section 9 - Glue-Pressure-Edit Menu
MC032 - MCP-25 Control
The value must be entered in either
meters per minute or feet per minute,
depending on the unit of measure
selected in the Setup menu.
e.
Move the cursor to the first “P” field (under “min”).
f.
Determine the necessary glue pressure required at
the minimum speed of the parent machine.
g.
Enter a pressure and check the amount of glue that
is applied.
h.
Using the numeric keypad, adjust the pressure if
necessary.
2.
Enter the necessary glue pressure at maximum speed of the
parent machine:
a.
Operate the parent machine at the maximum
production speed for the product to be glued.
b.
Move the cursor to the second field on the right of
“V” in the display.
c.
Enter the maximum speed of the parent machine in
this field.
The value must be entered in meters
per minute or feet per minute
depending on the units of measure
selected in the Setup menu.
d.
Move the cursor to the second “P” field.
e.
Determine the necessary glue pressure required at
the maximum speed of the parent machine.
f.
Enter a pressure and check the amount of glue that
is applied.
g.
Using the numeric keypad, adjust the pressure if
necessary
The glue pressure is now synchronized to change with
any corresponding changes in the speed of the parent
machine. Adjustments to the pressure curve may be
entered into the speed and pressure fields between
the minimum and maximum speed and pressure. The
control automatically sorts the entered values by
numeric order.
Entering the Glue-Pressure Data
Manually - Continued