Table of Contents
................................................................................... 7
.......................................................................................... 7
................................................................................................ 7
...........................................................................7
........................................................................................... 9
....................................................................................9
.............................................................................9
............................................................................. 9
.......................................................................10
Wet Basis and Dry Basis Measurement Output
................................... 10
........................................................................................ 11
Process Flow Range and Installation Type
.............................................11
Connectivity to Vaisala Insight Software
................................................11
Cable Gland Options and Lead-Throughs
.............................................14
................................................................................... 15
Using MGP261 in Hazardous Locations
......................................................... 17
Guidelines for Safe Use in Hazardous Conditions
................................ 17
Process Flow Range and Installation Type
.......................................... 20
NPT 1.5" Thread Test Plug 257525SP
......................................................21
..........................................................................21
Installation Option: Ball Valve Installation
............................................22
Installation Option: Flow-Through Adapter Installation
................................................................................24
Recommended Installation Position on Pipeline
.................................24
Gas Safety During Installation
............................................................... 25
Preparing Probe for Installation
................................................................... 26
Inserting Probe into Process and Opening Connection Box
....................................................................................... 29
.....................................................................................30
Attaching Flow-Through Adapter to MGP261
.............................................. 31
Installation Type Configuration in Insight
....................................................33
Operating with Insight Software
............................................................34
................................................................................ 34
..........................................................34
Connecting to Insight Software
....................................................................35
Installing the Driver for the USB Service Cable
...................................36
............................................................................................37
Table of Contents
1
Содержание MGP261
Страница 8: ...MGP261 User Guide M212273EN A 6...
Страница 50: ...4 Store the setting with Save MGP261 User Guide M212273EN A 48...
Страница 86: ...MGP261 User Guide M212273EN A 84...
Страница 88: ...MGP261 User Guide M212273EN A 86...
Страница 89: ......
Страница 90: ...www vaisala com...