3.5 Finalizing Installation
PULL INSTRUMENT OUT
BEFORE CLOSING VALVE
1
3
2
≥
4 mm2
1
Safety pin: in ball valve installations, lock the handle of the ball valve in the open position
with the safety pin to prevent damage caused by closing the valve with the instrument
inside.
2
MGP261 grounding terminal.
3
Use a
≥
4 mm
2
wire to connect the grounding terminal to the grounding rail of the
installation site.
1. Close and tighten the connection box (< 0.55 mm cover gap) and cable glands, and
tighten the probe to final tightness on the installation port by turning the tightening nut
with the wrench.
2. Connect the MGP261 grounding terminal to the grounding rail of the installation site with
a
≥
4 mm
2
wire.
3.
Ball valve installations only:
lock the handle of the ball valve in the open position with
the safety pin.
4. When done, switch on the power supply input.
More Information
‣
Installation Type Configuration in Insight (page 33)
MGP261 User Guide
M212273EN-A
30
Содержание MGP261
Страница 8: ...MGP261 User Guide M212273EN A 6...
Страница 50: ...4 Store the setting with Save MGP261 User Guide M212273EN A 48...
Страница 86: ...MGP261 User Guide M212273EN A 84...
Страница 88: ...MGP261 User Guide M212273EN A 86...
Страница 89: ......
Страница 90: ...www vaisala com...