10.ARITHMETICS
153
10-3. Feed Rate ([kg/h], [t/h])
Feed rate represents the weight of material per unit time being carried on the conveyer.
Decimal place of feed rate is determined by the setting of [Decimal Place (Flow)].
10-4. Load Ratio [%]
Load ratio represents the ratio of weight density (including moisture) over [RATED
WEIGHT DENSITY], shown in percentage. Thus the value is no affected by
[MOISTURE RATIO].
10-5. Feed Ratio [%]
Feed ratio represents the ratio of the current feed rate over [RATED FEED RATE],
shown in percentage.
Feed ratio depends on the belt speed, in contrast to load ratio, which is determined
solely by weight density. Note that feed ratio becomes null if the belt speed becomes
zero, reducing the feed rate to zero.
Feed Rate [kg/h]
=
Weight density [kg/m] × Belt speed [m/min] × 60
Feed Rate
Determined by weight density and the current value of belt speed.
Load Ratio [%]
Weight density [kg/m]
=
Rated weight density [kg/m]
×
100
Load Ratio
Weight density over [Rated Weight Density], represented in percentage.
Feed ratio [%]
Feed rate [kg/h]
=
Rated feed rate [kg/h]
×
100
Feed Ratio
Feed rate over [RATED FEED RATE], represented in percentage.
Содержание F805AT-BC
Страница 1: ...F805AT BC BELT SCALE CONTROLLER 15 Feb 2019 Rev 1 03 OPERATION MANUAL...
Страница 15: ...CONTENTS XIV M E M O...
Страница 202: ......