48
5. Installation
5.6 Multiple Battery Pack Connections
CAUTION!
Ensure correct polarity of the battery string series connection. DO NOT mix batteries with different
capacities, different brands or new and old batteries.
WARNING!
ENSURE CORRECT POLARITY OF STRING END CONNECTIONS TO THE BATTERY CIRCUIT BREAKER, AND
FROM THE BATTERY CIRCUIT BREAKER TO THE UPS TERMINALS (I.E. (+) TO (+) / (-) TO (-) / (N) TO (N)).
DISCONNECT ONE OR MORE BATTERY CELL LINKS IN EACH TIER. DO NOT RECONNECT THESE LINKS
AND DO NOT CLOSE THE BATTERY CIRCUIT BREAKER UNLESS ALL CONNECTIONS ARE PROPERLY
CHECKED AND APPROVED.
UPS Battery Cabinet
Figure 5-46: Connection of BP240V65L and BP240V65L-NIB for 10kVA, 15kVA and 20kVA UPS
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...