8
3. Battery Cabinet Installation
3.4 Package Contents
Part
Number
Description
BP240V65
BP240V65L
BP240V65-
NIB
BP240V65L-
NIB
BP240V100
BP240V100L
BP240V100-
NIB
BP240V100L-
NIB
Owners
Manual
933BF8
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Battery
Cables
731891
"Battery cables
to connect to
S3M10-20K
UPS"
2
2
2
2
2
No
2
No
Battery
Insulators
83084A/
83084B
Protective
materials
N/A
N/A
4/5
8/8
N/A
N/A
N/A
N/A
"Cabinet
Bottom Side
Metal
Skirts"
1038F7A
Cover bottom
area of cabinet
2
N/A
2
N/A
2
N/A
2
N/A
"Cabinet
Bottom Side
Metal
Skirts"
1038F8A
Cover bottom
area of cabinet
2
2
2
2
2
2
2
2
"Cabinet
Bottom Side
Metal
Skirts"
1038F8A
Cover bottom
area of cabinet
N/A
2
N/A
2
N/A
2
N/A
2
Battery
Cables for
"-NIB"
Models
Several
P/N
For connecting
the battery
strings to the
cabinet
N/A
N/A
10
16
N/A
N/A
10
16
Copper
Jumper
Bars
1038F3
For intercon-
necting adjacent
batteries
N/A
N/A
10
20
N/A
N/A
N/A
N/A
Copper
Jumper
Bars
1038F4
For intercon-
necting adjacent
batteries
N/A
N/A
3
8
N/A
N/A
N/A
N/A
Copper
Jumper
Bars
1038F5
For intercon-
necting adjacent
batteries
N/A
N/A
N/A
N/A
N/A
N/A
3
8
Copper
Jumper
Bars
1038F6
For intercon-
necting adjacent
batteries
N/A
N/A
N/A
N/A
N/A
N/A
10
20
3.5 Internal Wiring (Typical)
• Battery cabinets use multiple 12V DC batteries connected in series to provide nominal DC voltage of 240V DC (±120V DC).
• Internal cabling is sized for specific application load currents. Do not use any other cable size other than the one provided in
the battery cabinet.
• Each battery cabinet shelf includes a specific wiring diagram. Refer to section
6. Installation
for battery installation details.
• All circuit breakers are in the middle tier of the battery cabinet.
• All load connection polarities will be labeled as “+” (battery positive), “-“ (battery negative) and “N” (battery center tap)
for ±120V DC strings.
• All battery cabinets are provided with a branch circuit overcurrent protection device and may be wired directly to the load
or UPS.
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...