16
5. Installation
5. Use a forklift to lift the battery cabinet from the pallet.
5.2 Selecting Installation Position
Select a proper environment to install the unit, in order to minimize the possibility of damage to the battery system and
maximize the life of the batteries.
1. Do not block air flow to the ventilation openings of the unit.
2. Ensure environmental conditions of the installation site are in accordance with the unit specifications to avoid overheat
and excessive moisture. Refer to section
4.2 Physical Requirements
.
3. Do not place the unit in a dusty or corrosive environment or near any flammable objects.
4. The unit is not designed for outdoor use.
Notes:
• Place the battery cabinet in a clean, stable environment. Avoid vibration, dust, humidity, flammable gases, liquids and corrosives.
• To help prevent high temperatures in the room where the UPS is installed, extractor fans and/or cooling systems are recommended.
• Batteries should be mounted in an environment where the temperature is within the required specifications. Temperature is a key
factor in determining battery life and capacity. Battery temperature should be maintained between 59°F to 77°F (20°C to 25°C).
Keep batteries away from heat sources, main air ventilation areas, etc.
WARNING!
Typical battery performance data reflects an operating temperature between 59°F to 77°F (20°C to 25°C).
Operating the UPS above this range will reduce the battery life, while operating the UPS below this range will
reduce battery capacity.
• If the UPS will not be installed immediately, it must be stored in a room without excessive heat or humidity.
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...