5.3 Power Cables
The cable design shall comply with the voltages and currents provided in this section, and in accordance with local electrical codes.
WARNING!
UPON STARTING, PLEASE ENSURE YOU ARE AWARE OF THE LOCATION AND OPERATION OF THE EXTERNAL
ISOLATORS CONNECTED TO THE UPS INPUT/BYPASS SUPPLY OF THE UTILITY DISTRIBUTION PANEL.
CHECK TO SEE IF THESE SUPPLIES ARE ELECTRICALLY ISOLATED AND POST ANY NECESSARY WARNING
SIGNS TO PREVENT ANY INADVERTENT OPERATION
5.3.1 Cable Sizes
5.4 Battery Cabinet Connections:
Models BP240V65, BP240V65-NIB,
BP240V100 and BP240V100-NIB
Each battery cabinet design includes built-in internal battery
connection cables, breaker, fuses and terminals. The standard
cabinet can hold 20 pieces of 12V 65Ah 12V 100Ah batteries.
The DC voltage system for all cabinets is 240VDC with ±120V
internal battery strings.
Figures 6-1 and 6-2 show the overall chassis design
and exploded views for the BP240V65, BP240V65-NIB,
BP240V100 and BP240V100-NIB models. The corresponding
views for the BP240V65L, BP240V65L-NIB, BP240V100L and
BP240V100L-NIB models are shown in section
6.5 Battery
Cabinet Connections: Models BP240V65L, BP240V65L-
NIB, BP240V100L and BP240V100L-NIB.
6. Installation
UPS
MODEL
BP240V65 / BP240V100
BP240V65-NIB / BP240V100-NIB
BP240V65L / BP240V100L
BP240V65L-NIB / BP240V100L-NIB
Recommended
Torque
CABLE SIZES (THHW wiring at 167°F / 75°C)
DC INPUT
GROUNDING
DC INPUT
GROUNDING
10kVA
6 AWG
6 AWG
6 AWG
6 AWG
Anderson Connector
(No Torque Parameter)
0kgf.com / 0N•m
15kVA
6 AWG x 2
6 AWG x 2
6 AWG x 2
6 AWG x 2
20kVA
6 AWG x 2
6 AWG x 2
6 AWG x 2
6 AWG x 2
25kVA
1/0 AWG
2 AWG
1/0 AWG
2 AWG
450kgf.cm/
44N•m
30kVA
1/0 AWG
1/0 AWG
1/0 AWG
1/0 AWG
50kVA
2/0 AWG
2/0 AWG
2/0 AWG
2/0 AWG
60kVA
2/0 AWG
2/0 AWG
2/0 AWG
2/0 AWG
80kVA
2/0 AWG x 2
2/0 AWG x 2
100kVA
2/0 AWG x 2
2/0 AWG x 2
Figure 5-1: BP240V65, BP240V65-NIB, BP240V100,
& BP240V100-NIB Battery Cabinet Chassis
* S3M10-30K UPS systems do not support BP240V100L/100L-NIB battery cabinet models.
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...