52
6. Operation and Configuration of
S3M UPS Models and Battery Cabinets
6.1 S3M UPS Compatibility with BP240V65 to
BP240V100L Battery Cabinets
Cabinets with
Internal Batteries
BP240V65
BP240V65L
BP240V100
BP240V100L
Cabinets with NO
Internal Batteries
BP240V65-NIB
BP240V65L-NIB
BP240V100-NIB
BP240V100L-NIB
10kVA-20kVA
UPS with Internal
Batteries
• S3M10K1B,
S3M10K2B,
S3M10K3B
• S3M15K2B
S3M15K3B
• S3M20K3B
No
No
No
No
10kVA-20kVA UPS
with NO Internal
Batteries
• S3M10K-NIB
• S3M15K-NIB
• S3M20K-NIB
Yes
Yes
Yes
No
Cabinets with
Internal Batteries
BP240V65
BP240V65L
BP240V100
BP240V100L
Cabinets with NO
Internal Batteries
BP240V65-NIB
BP240V65L-NIB
BP240V100-NIB
BP240V100L-NIB
25kVA-100kVA
UPS with NO
Internal Batteries
• S3M25K
• S3M30K
Yes
Yes
Yes
No
• S3M50K
Yes
Yes
Yes
Yes
• S3M60K
No
Yes
Yes
Yes
• S3M80K
• S3M100K
No
Yes
No
Yes
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...