7.1 Battery Cabinet Specifications
(DC Nominal Voltage: ± 120V DC, 240V DC)
Battery Pack
BP240V65 (-NIB)
BP240V100 (-NIB)
BP240V65L (-NIB)
BP240V100L (-NIB)
Dimension
W × D × H
31.5 x 35.4 x 47.2 in.
(800 x 900 x 1200 mm)
31.5 x 43.3 x 63 in.
(800 x 1100 x 1600 mm)
Weight
608 lb. (275.8 kg)*
930 lb. (421.8 kg)*
1083 lb. (491.2 kg)*
1637 lb. (742.5 kg)*
Breaker
1x 250A
1x 600A
Fuse
2x 400A
4x 400A
*Models with the –NIB suffix do not include internal batteries, so their total weight varies based on batteries installed by the end user.
7. Specifications
Storage
The battery cabinet must be stored in a clean, secure environment with a temperature less than 104°F (40°C) and a relative
humidity less than 90% (non-condensing). Store the battery cabinet in its original shipping container if possible. Charge
the batteries for at least 24 hours prior to use. Do not rely on the battery cabinet to provide backup power to connected
equipment until the batteries are fully charged.
Note:
If the UPS system remains off for an extended period of time, it should be turned on periodically to allow the batteries
to recharge. The UPS system should be turned on and the batteries should be recharged at least one uninterrupted 24-hour
period every 3 months. Failure to recharge the batteries periodically may cause irreversible battery damage.
8. Storage
Service
Your Tripp Lite product is covered by the warranty described in this manual. A variety of Extended Warranty and On-Site Service Programs are
also available from Tripp Lite. For more information on service, visit tripplite.com/support. Before returning your product for service, follow
these steps:
1. Review the installation and operation procedures in this manual to ensure that the service problem does not originate from a misreading
of the instructions.
2. If the problem continues, do not contact or return the product to the dealer. Instead, visit tripplite.com/support.
3. If the problem requires service, visit tripplite.com/support and click the Product Returns link. From here you can request a Returned
Material Authorization (RMA) number, which is required for service. This simple on-line form will ask for your unit’s model and serial
numbers, along with other general purchaser information. The RMA number, along with shipping instructions will be emailed to you. Any
damages (direct, indirect, special or consequential) to the product incurred during shipment to Tripp Lite or an authorized Tripp Lite service
center are not covered under warranty. Products shipped to Tripp Lite or an authorized Tripp Lite service center must have transportation
charges prepaid. Mark the RMA number on the outside of the package. If the product is within its warranty period, enclose a copy of your
sales receipt. Return the product for service using an insured carrier to the address given to you when you request the RMA.
9. Service and Warranty
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...