5. Installation
Figure 5-25A: Front view
5.5.2 Battery Installation and Connection
The 40 batteries can be divided into two groups connected in parallel for use. Each group has 20 batteries in series
(BAT+, N and BAT-). Place the batteries in the cabinet from the bottom to top one-by-one, then connect the battery cables
according to the diagrams that follow.
Note:
The positive and negative polarity of the battery cannot be reversed or short circuited. Doing so will damage the battery and/or cause
injury. Do not touch the battery’s positive and negative terminals at the same time. Before replacing or removing the batteries, disconnect
the breaker, pull up cell terminals and remove the screws of the copper bus bar. Not following the instructions could result in damage to the
equipment or personal injury. The installation must consist of 40 batteries.
Layer 3
Layer 4
Layer 2
Layer 1
Battery Group 2
Battery Group 1
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...