6. Operation and Configuration of
S3M UPS Models and Battery Cabinets
6.3.4 Configuring the S3M25-100K UPS and Optimizing Charging of
the BP240V65/V65L and BP240V100/V100L Battery Cabinets
Step 1: Setting the Battery Group
The Battery Group is Quantity 1 for every set of 20 batteries that are in and/or connected to the UPS model. For example,
UPS model S3M100K UPS has no internal batteries and is Battery Group 1 by default. However, to connect a BP240V100L
cabinet with 40 internal batteries to the S3M100K, the S3M100K UPS must be configured to Battery Group 2. To connect
a second BP240V100L cabinet to the S3M100K UPS, the Battery Group must be set to 4 (four sets of 20 batteries). Obtain
the
Battery Group
number based on the specific S3M UPS and Battery Cabinet models combination from the chart under
Section 6.4.
The value can be 1 to 8. The default value is 1 for S3M UPS models without internal batteries.
Step 2: Setting the Battery Number
The battery number must remain at 20 for all S3M10-100K UPS models when connected to Tripp Lite external battery
cabinets designed for the S3M-Series UPS Series.
Step 3: Setting Single Battery (Ah) Capability
Change the Single Battery (Ah) Capability to the individual Ah capacity for one individual battery as follows for the specific
battery cabinet model:
•
BP240V40/BP240V40L: the Single Battery (Ah) Capacity is 40
•
BP240V65/BP240V65L: the Single Battery (Ah) Capacity is 65
•
BP240V100/BP240V100L: the Single Battery (Ah) Capacity is 100
The Single Battery (Ah) values can be 7~2000.
Scroll to the next display screen by pressing the down arrow.
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...