30
5. Installation
Figure 5-19: Model BP240V65-NIB
Figure 5-20: Model BP240V100-NIB
10. Connect the cables from battery 1+ to BAT+ bus bar, battery 10- to BATN bus bar, battery 11+ to BATN bus bar, battery
20- to BAT- bus bar and the layer connect cables (Figure 5-19: Model BP240V65-NIB or Figure 5-20:
Model BP240V100-NIB and Figure 5-21).
Notes:
• Use the wiring schematics as reference
for the following assemblies:
Use Figure 5-4 for BP240V65-NIB
Use Figure 5-5 for BP240V100-NIB
• This manual may be downloaded
in color at tripplite.com, which
shows the cables in corresponding
colors:
Red = Positive
Blue = Center Tap
Black = Negative
Содержание BP240V100
Страница 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Страница 34: ...34 Figure 5 25B Rear View 5 Installation Fuses 400A x2 Battery breaker 25 100kVA connector 10 20kVA connector...
Страница 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Страница 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Страница 55: ...55 6 2 3 Battery Setup Click Battery Setup 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Страница 99: ...99 Figura 5 21 5 Instalaci n Figura 5 22 11 Vuelva a instalar todas las cubiertas y tornillos Figura 5 22...
Страница 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Страница 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Страница 117: ...117 5 Instalaci n UPS Gabinete de Bater as Figura 5 47 Conexi n de BP240V65L y BP240V65L NIB para UPS de 25kVA y 30kVA...
Страница 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Страница 168: ...168 Figure 5 21 5 Installation Figure 5 22 11 R installer tous les couvercles et toutes les vis Figure 5 22...
Страница 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Страница 184: ...184 Figure 5 45 12 R installer tous les couvercles et toutes les vis Figure 5 45 5 Installation...
Страница 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Страница 207: ...207...
Страница 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...