- 8 -
tousek
/ E_TPS-20_03 / 30. 08. 2016
2
1
1a
1b
3
2
Z
1
10–185
Z15M4
NOTE concerning cable laying
• The electric cables have to be laid in insulating sleeves which are suitable for underground usage. The insulat
-
ing sleeves have to be lead into the inner of the operator housing (see picture).
• 230V cables and control lines have to be laid in separate sleeves.
• Only double-insulated cables, which are suitable for underground usage (e.g. E-YY-J) may be used.
• In case that special regulations require another type of cable, cables according to these regulations have to be
used.
2.1 Installation of the motor
Installation
After installing the protection tubes
(check cable exit of operator (1a))
and having finished the concrete foundation,
the motor has to be bolted through the 4 slotted holes
(1b)
to the concrete foundation. It is particularly important that the
operator is mounted parallel to the gate panel, and that the measurements given in the drawing are kept.
Mounting dimensions TPS 20 (in mm)
(1)
Ground plate
(1a)
Cable inlet
(1b)
Slotted holes (4x) for connection on the ground
(2)
Gear wheel
(3)
Emergency release
(Z)
Steel gear rack
Содержание TPS 20
Страница 45: ...tousek E_TPS 20_03 30 08 2016 45 ...
Страница 46: ... 46 tousek E_TPS 20_03 30 08 2016 ...