2-6
Installation
2
Use four of the bolts and anchors that came with your rack to
bolt the flanges to the front vertical railing. Begin by inserting
and tightening the
bottom
two bolts, then the top two.
!
Leave room above and below for adequate ventilation.
Use fan trays if necessary.
Power
Be sure the power switch on the MP/16 is turned OFF before
plugging in the power cable.
The supplied power cable plugs into the back of the MP/16 and
connects to any standard, grounded 110v, 60Hz AC electrical
outlet.
Figure 2-4. Power Cord
NOTE:
You may want to install a line noise filter/surge protector
between the power source and the MP/16.
Содержание MP/16
Страница 4: ......
Страница 12: ...1 6 Overview...
Страница 36: ...2 24 Installation...
Страница 41: ...Using Total Control MIBs 3 5 udp The MP 16 supports the mandatory UDP User Datagram Protocol group...
Страница 150: ...D 26 AT Command Reference...
Страница 162: ...E 12 Modem Testing...
Страница 168: ...F 6 Warranty and Regulatory Information...
Страница 178: ...G 10 Technical Specifications...