11
6
.
28
Meter output
・‥・・・・・・‥‥‥‥
F-65
6
.
28
.
1
Setting of meter outputs
・‥・・・・・・‥‥‥‥
F-65
6
.
28
.
2
Setting of optional meter outputs
・‥・・・・・・‥‥‥‥
F-65
6
.
28
.
3
Pulse output to meters
・‥・・・・・・‥‥‥‥
F-65
6
.
29
Control panel parameters
・‥・・・・・・‥‥‥‥
F-66
6
.
29
.
1
Prohibiting the change of parameter settings
・‥・・・・・・‥‥‥‥
F-66
6
.
29
.
2
Changing the units of display
・‥・・・・・・‥‥‥‥
F-66
6
.
29
.
3
Display the motor speed and the load speed
・‥・・・・・・‥‥‥‥
F-67
6
.
29
.
4
Column number below decimal point of Frequency, Acc/dec time
・‥・・・・・・‥‥‥‥
F-67
6
.
29
.
5
Changing items displayed in status monitor mode
・‥・・・・・・‥‥‥‥
F-68
6
.
29
.
6
Switching basic parameters
・‥・・・・・・‥‥‥‥
F-68
6
.
29
.
7
Selecting a control panel stop pattern
・‥・・・・・・‥‥‥‥
F-69
6
.
29
.
8
Resetting the inverter from the control panel
・‥・・・・・・‥‥‥‥
F-69
6
.
29
.
9
Selecting a torque limit in control panel operation mode
・‥・・・・・・‥‥‥‥
F-69
6
.
29
.10
Canceling PID control in panel operation mode
・‥・・・・・・‥‥‥‥
F-70
6
.
29
.11
Setting a torque command in panel operation mode
・‥・・・・・・‥‥‥‥
F-70
6
.
29
.12
Drooping control in panel operation mode
・‥・・・・・・‥‥‥‥
F-70
6
.
29
.13
Override in panel operation mode
・‥・・・・・・‥‥‥‥
F-70
6
.
29
.14
Restricting or prohibiting key operation
・‥・・・・・・‥‥‥‥
F-71
6
.
30
Communication function (RS485/common serial)
・‥・・・・・・‥‥‥‥
F-72
6
.
30
.
1
Common serial optional
・‥・・・・・・‥‥‥‥
F-72
6
.
30
.
2
Using the RS485 port fitted as standard
・‥・・・・・・‥‥‥‥
F-74
―
For designing a system
―
7.
Operation with external signal
‥・・・・‥・・・・・‥
G-1
7
.
1
External operation
‥・・・・‥・・・・・‥
G-1
7
.
2
Applied operation with input and output signals (operation by the terminal board)
‥・・・・‥・・・・・‥
G-2
7
.
2
.
1
Functions of input terminals (in case of sink logic)
‥・・・・‥・・・・・‥
G-2
7
.
2
.
2
Functions of output terminals (in case of sink logic)
‥・・・・‥・・・・・‥
G-5
7
.
2
.
3
Setup of input/output terminal operation time
‥・・・・‥・・・・・‥
G-9
7
.
2
.
4
Analog input filter
‥・・・・‥・・・・・‥
G-9
7
.
3
Setup of external speed command (analog signal)
‥・・・・‥・・・・・‥
G-10
7
.
3
.
1
Setup by analog input signals (RR terminal)
‥・・・・‥・・・・・‥
G-11
7
.
3
.
2
Setup by analog input signals (VI/II terminal)
‥・・・・‥・・・・・‥
G-12
7
.
3
.
3
Setup by analog input signals (RX terminal)
‥・・・・‥・・・・・‥
G-13
8.
Monitoring operation status
‥・・・・‥・・・・・‥
H-1
8
.
1
Status monitor mode
‥・・・・‥・・・・・‥
H-1
8
.
2
Changing status monitor function
‥・・・・‥・・・・・‥
H-4
8
.
3
Indication in trip status
‥・・・・‥・・・・・‥
H-6
8
.
4
Indication of alarm, pre-alarm, etc...
‥・・・・‥・・・・・‥
H-8
9.
Selection of peripheral devices
‥・・・・‥・・・・・‥
I-1
9
.
1
Selection of wiring equipment
‥・・・・‥・・・・・‥
I-1
9
.
2
Installation of electromagnetic contactor
‥・・・・‥・・・・・‥
I-3
9
.
3
Installation of overload relay
‥・・・・‥・・・・・‥
I-4
9
.
4
Application and functions of options
‥・・・・‥・・・・・‥
I-5
9
.
5
Optional add-on cassettes
‥・・・・‥・・・・・‥
I-10
9
.
6
Board options
‥・・・・‥・・・・・‥
I-12
9
.
7
Before installing optional add-on cassette or board option
‥・・・・‥・・・・・‥
I-13
9
.
7
.
1
Case 1
‥・・・・‥・・・・・‥
I-13
9
.
7
.
2
Case 2
‥・・・・‥・・・・・‥
I-14
9
.
7
.
3
Case 3
‥・・・・‥・・・・・‥
I-14