<Indication 1> <Indication 2>
[4-way valve invert failure]
Outdoor control board operation check direction (Self-hold valve) = P805HR-E, P1105HR-E
1)With the dip switch SW804 set as in the table below, pressing SW801 for approx. 1 second
can check the operation of switching to cooling cycle or to heating cycle.
• The board are energized for 10 seconds.
• Take more than a minute for the next check because the parts (coil, resistance R700)
generate large heat. (This does not apply when no coil is connected.)
2)After the check, set all the SW804 dip switches to OFF.
Note:
Check with a tester
With an analog tester: If a tester shows 180DCV or higher, the board is good.
With digital tester:
Although values shown has some range, if its maximum value is
180DCV or higher, the board is good.
Check code
Outdoor LED
indication
Check and Action procedure
(No specific description indicates outdoor unit parts.)
Temperature sensor check
TE sensor CN601
TS sensor CN600
Hydro TWO sensor
If defective, repair or replace it
4-way valve check
If defective, replace it
4-way valve operates normally.
(Check piping temperature at the
time of cooling/heating operation)
No
Yes
Replace 4-way coil
4-way valve coil resistance
is 1.3 to 1.6 k .
No
Yes
Outdoor control board operation
check (See below)
NG
OK
Check outdoor board
If defective, replace it
Switching to cooling cycle
Switching to heating cycle
CN701
SW804 SW801
180DCV or higher
Press
1
ON
234
CN701
SW804 SW801
180DCV or higher
Press
1
ON
234
Содержание HWS-P1105HR-E
Страница 177: ...176 E P Box Assembly Hydro Unit 220 221 223 222 224 225 226 227 228 229 230 231 232 233 239 240 235 234 235 224 ...
Страница 181: ...180 Inverter Assembly HWS P805HR E P1105HR E 711 709 710 705 706 707 704 703 701 708 702 TD TL TS TE TO TO TE ...
Страница 183: ...182 ...
Страница 184: ...Copyright 2017 TOSHIBA CARRIER CORPORATION ALL Rights Reserved ...