14
SETUP INSTRUCTIONS
15.
Assemble the RH Boom Support Assembly
to the other Extension Boom Pipe.
16.
Adjust the Booms to a level position by
adjusting the jam nuts on the adustable clevis
assemblies (See FIG. 4, page 13) to the desired
position, then tighten the nuts against the Main
Frame plate.
17.
Attach three (3) Double Barb Turret Bodies
and one (1) Single Barb Turret Body with Clamp
Assemblies on each Extension Boom Pipe as
shown in
FIG. 6, page 13.
18.
Level Nozzles and space 20" apart. Connect
the Turret Body Assemblies with 3/4" x 19" Jumper
Hoses and a 3/4" x 21" Jumper Hose. Secure
with hose clamps. (See FIG. 6, page 13)
13.
Attach the LH Boom Support Assembly to
the Pivot Assembly, using a 5/16" x 1-1/2" cap
screw and lock nut. (See FIG. 5 & 6, page 13 )
14.
Secure the two (2) plates of the Boom
Support Assembly to the Extension Boom Pipe,
using two (2) 1/4" U-bolts, four (4) lock nuts and
flat washers
.
(See FIG. 6, page 13)
1. Pressure Tee
2. Pressure Supply Hose
3. U-Shaped Fork
FIG. 7
4. Agitation Hose
5. Agitation Valve
3
1
4
2
1898
5
19.
Place a hose clamp on the center Boom
Feeder H
O
se and attach it to the 90° Hose Barb
at the RH end of Center Boom Pipe.
20.
Place a hose clamp on the right and left
Boom Feeder Hose and attach them to the
Double Barb Nozzles on the right and left Boom
Pipes.
NOTES:
Содержание 41107-210000101
Страница 45: ...45 VEHICLE ELECTRICAL DIAGRAM 1703...
Страница 46: ...46 NOTES...
Страница 69: ...69 SPRAY SYSTEM FLOW DIAGRAM SPYSYT 1200 1...
Страница 77: ...77 NOTES...
Страница 78: ...78 NOTES...
Страница 79: ...79 NOTES...