![Tonghui Electronics TH2826/A Скачать руководство пользователя страница 38](http://html.mh-extra.com/html/tonghui-electronics/th2826-a/th2826-a_operation-manual_1126460038.webp)
TH2826 Operation manual
Ver1.0
◇
30
Operational step of open correction
1) Move cursor to
Short
,
the following softkeys are displayed.
ON
OFF
Short full clear
DCR Open
2
)
Connect fixture to test terminal.
3)
Press
Short full clear
,
TH2826 can test short admittance of 41frequency points. It costs
75 seconds for open correction. The following softkeys are displayed.
Drop
The softkey can cancel the current open correction. The former data is reserved.
4)
Press
DCR open
,
TH2826 can test short resistance
5)
Press
ON
, the short correction is valid
,
TH2826 then perform short correction
calculation . If frequency1
,
frequency 2 and frequency 3 is set as OFF, the insertation
method is adopted to calculate the date. If frequency1
,
frequency 2 and frequency 3 is set
as ON, meanwhile the test frequency is equal to frequency1
,
frequency 2 or frequency 3
,
then open data of frequency1
,
frequency 2 and frequency 3 is used to calculate the short
correction.
6)
Press
OFF
,
turn off the correction function.
3.5.3
Load correction
Operational step of load correction
1)
Move cursor to
Freq1
,
Freq 2
or
Freq 3
. the following softkeys are displayed.
ON
The current test date of open/short/load correction is valid.
OFF
The current test date of open/short/load correction is invalid.
Open single clear
Execute open test of frequency 1
,
2 or 3.
Short single clear
Execute short test of frequency 1
,
2 or 3.
Load correction
Execute load test of frequency 1
,
2 or 3.
2)
Press
ON
, the former open/short/load is displayed.
3)
Press numeric key to input frequency
4)
Connect fixture to test terminal.
5)
Use fixture to open.
Содержание TH2826/A
Страница 49: ...TH2826 Operation manual Ver1 0 41 Figure 3 15 ...