7.2.3.1

 

Biodegradable hydraulic oil (Optional) 

 

At the request of the customer, the machines can be supplied with biodegradable hydraulic oil compatible with the environment. 

Biodegradable  hydraulic  oil  is completely  synthetic,  without zinc, non-polluting  and  highly  efficient  with  saturated  ester base, 
combined with special additives. The machines with biodegradable oil use the same component parts as standard machines, 

but the use of such type of oil is best taken into account from machine construction. 
In case of wanting to change from mineral-

oil based hydraulic oil to “bio” oil, the following procedure mu

st be followed. 

 

 

7.2.3.2

 

Emptying 

 

Empty the hot hydraulic oil for entire system operation (oil tank, cylinders, large-volume pipes). 

 
 

7.2.3.3

 

Filters 

 

Change the filtering inserts. Use standard filters as indicated by the manufacturer. 

 
 

7.2.3.4

 

Washing 

 

After completely emptying the machine, fill the recommended type and quantity of 

“bio” oil.

 

Start the machine and perform all work movements at low revs for at least 30 minutes. 

Drain the liquid from the system as indicated at 7.2.3.2. 

Warning: 

During the entire washing procedure, avoid air entering the system. 

 

 

7.2.3.5

 

Filling 

 
After washing, fill the hydraulic circuit, bleed and check the level. 

Bear in mind that contact of fluid with the hydraulic pipes can cause swelling. 
Also remember that contact of fluid with the skin can cause reddening or irritation. 
Also use suitable PPE during these operations (e.g., protective eyewear and gloves). 

 
 

7.2.3.6

 

Commissioning / check 

 

“Bio”  oil  behaves regularly,  but  it  must  be  checked  by taking  a  sample  at set  intervals  according  to  the  indications prov

ided 

below: 

 

CHECK FREQUENCY 

NORMAL DUTY 

HEAVY DUTY 

1

st

 CHECK AFTER 

50 OPERATION HOURS 

50 OPERATION HOURS 

2

nd

 CHECK AFTER 

500 OPERATION HOURS 

250 OPERATION HOURS 

3

rd

 CHECK AFTER 

1000 OPERATION HOURS 

500 OPERATION HOURS 

FOLLOWING CHECKS 

1000 HOURS OR 1 OPERATION YEAR  500 HOURS OR 1 OPERATION YEAR 

 
The  fluid  state  is  therefore  constantly  monitored,  thus  allowing  its  use  until  its  features  decay.  Normally,  in  the  absence  of 
contaminating agents, the oil is never completely changed, but only occasionally topped-up. 

 
The oil samples (at least 500ml) must be taken with the system at operating temperature. 

It is recommended to use new and clean containers. 
 

The samples must be sent to the “bio” oil supplier. For more dispatch details, contact Your nearest dist

ributor. 

 

Copies of the analysis report must be kept in the check register. This is mandatory. 

 

 

Содержание AIRO A Series

Страница 1: ...S ELEVADORAS AUTOPROPULSADAS ZELFRIJDENDE HOOGWERKERS SJ LVG ENDE ARBETSPLATTFORMAR SAMOKRETNE RADNE PLATFORME A SERIES A16 J A18 J USE AND MAINTENANCE MANUAL ENGLISH ORIGINAL INSTRUCTIONS AIRO is a d...

Страница 2: ...2012 09 Removed parking brakes in electric and electro diesel versions changed descriptions and hydraulic diagram 2013 10 Specified instructions for harness anchoring points 2014 09 Inserted informati...

Страница 3: ...Intended use 7 1 3 1 Leaving at height 8 1 4 Description of the machine 8 1 5 Control panels 9 1 6 Power supply 9 1 7 Machine life demolition and decommissioning 9 1 8 Identification 10 1 9 Location o...

Страница 4: ...lay E 50 5 2 6 Battery charger warning light F 50 5 2 7 Enabled control panel warning light G 50 5 2 8 Diesel engine warning lights H L M N 50 5 2 9 Levers of movement of the platform O P Q R S T U 50...

Страница 5: ...nt of the braking valves 76 7 2 11 Inclinometer operation check 77 7 2 12 Operation check and adjustment of platform overload controller 79 7 2 13 Overload controller by pass ONLY FOR EMERGENCY OPERAT...

Страница 6: ...dures in force in your country from the boards responsible for industrial safety This manual contains a final section called Check register for a better filing of documents and recording of any modifi...

Страница 7: ...rm intended for lifting persons and materials equipment and work materials in order to carry out maintenance installation cleaning painting de painting sand blasting welding operations etc The max cap...

Страница 8: ...hat said above is not a formal authorization of the manufacturer for the leaving at height but it wants to supply information to the employer who is fully responsible for that which can be useful for...

Страница 9: ...omposed of rechargeable accumulators and electric pump A heat engine Diesel engine models are identified by the abbreviation D petrol engine models are identified by the abbreviation B a dual powered...

Страница 10: ...he various stickers applied on the machine be lost or illegible it is to be replaced as soon as possible In order to identify the machine when no plate is available the serial number is also stamped o...

Страница 11: ...Hydraulic control unit 4 Hydraulic drive motors 5 Turret rotation hydraulic motor 6 230V plug optional 7 Spirit level optional for visual check of machine levelling 8 Lifting cylinders 9 Battery 10 Po...

Страница 12: ...nd material weight me indoors 70 Kg Max number of people on the platform n outdoors 2 Tool and material weight me outdoors 70 Kg Maximum drive height Max Maximum dimensions of platform 0 8 x 1 7 m Max...

Страница 13: ...Diesel oil tank capacity NA Lt Max drive speed NA km h 380V three phase electrical pump optional Motor power NA kW Max absorbed current NA A Max drive speed NA km h 230V single phase electric pump opt...

Страница 14: ...Use and Maintenance Manual A16 J A18 J Series Page 14...

Страница 15: ...rt dimensions 5 5 x 1 765 x 1 985 m Transport dimensions with retracted jib N A m Machine weight unloaded 7600 Kg Stability limit Longitudinal slope 3 Transversal slope 3 Maximum wind speed 12 5 m s M...

Страница 16: ...0V single phase electric pump optional Motor power NA kW Max absorbed current NA A Max drive speed NA km h In some cases different limits can be fixed It is recommended to comply with the data shown o...

Страница 17: ...Use and Maintenance Manual A16 J A18 J Series Page 17...

Страница 18: ...lifting circuit 230 bar Min pressure of braking circuit 50 60 bar Tyre dimensions 800 x 320 mm Type of tyres 12 x 16 5 Transport dimensions 5 5 x 2 x 2 05 m Transport dimensions with retracted jib N A...

Страница 19: ...rolyte quantity 7 Lt Diesel oil tank capacity 45 Lt 380V three phase electrical pump optional Motor power NA kW Max absorbed current NA A Max drive speed NA km h 230V single phase electric pump option...

Страница 20: ...Use and Maintenance Manual A16 J A18 J Series Page 20...

Страница 21: ...pressure of braking circuit 50 60 bar Tyre dimensions 730 x 230 mm Tyre type 250 15 Transport dimensions 6 47 x 1 765 x 1 985 m Transport dimensions with retracted jib N A m Machine weight unloaded 8...

Страница 22: ...nal Motor power NA kW Max absorbed current NA A Max drive speed NA km h In some cases different limits can be fixed It is recommended to comply with the data shown on the machine plate me m n x 80 Win...

Страница 23: ...Use and Maintenance Manual A16 J A18 J Series Page 23...

Страница 24: ...ort dimensions 6 47 x 1 765 x 1 985 m Transport dimensions with retracted jib N A m Machine weight unloaded 8140 Kg Stability limit Longitudinal slope 3 Transversal slope 3 Maximum wind speed 12 5 m s...

Страница 25: ...optional Motor power NA kW Max absorbed current NA A Max drive speed NA km h In some cases different limits can be fixed It is recommended to comply with the data shown on the machine plate me m n x...

Страница 26: ...Use and Maintenance Manual A16 J A18 J Series Page 26...

Страница 27: ...lifting circuit 230 bar Min pressure of braking circuit 50 60 bar Tyre dimensions 800 x 320 mm Type of tyres 12 x 16 5 Transport dimensions 6 74 x 2 x 2 05 m Transport dimensions with retracted jib N...

Страница 28: ...rolyte quantity 7 Lt Diesel oil tank capacity 45 Lt 380V three phase electrical pump optional Motor power NA kW Max absorbed current NA A Max drive speed NA km h 230V single phase electric pump option...

Страница 29: ...Use and Maintenance Manual A16 J A18 J Series Page 29...

Страница 30: ...A the level of acoustic pressure at ground control panel does not exceed 85dB A the level of acoustic pressure at platform control panel does not exceed 78dB A As to vibrations in ordinary working con...

Страница 31: ...machine The employer is responsible for training The platform is intended for people carriage therefore it is necessary to comply with the current local regulations relevant to this class of machines...

Страница 32: ...d indoors only In the event of rain or in parking condition always protect the platform control panel with the specially provided cap if any or a waterproof tarpaulin Do not use the machine in areas w...

Страница 33: ...assis or on the turret see paragraph Location of main components brings the machine to a complete halt and signals the fault by means of a continuous hissing sound Electric powered machines feature a...

Страница 34: ...ome spray Small trees in leaf begin to sway small waves start to form on inland waters 6 40 50 10 8 13 9 Strong breeze Long waves begin to form White foam crests are very frequent Some sprays Whole tr...

Страница 35: ...achine measured outside the wheels or Cross width of machine measured between levelling stabilizer centres i cm Wheel base Longitudinal length of machine measured between wheel centres or Longitudinal...

Страница 36: ...tact with or vicinity to power lines According to the applicable laws and the following table a minimum distance from the power lines must be kept Type of power lines Voltage KV Minimum distance m Lig...

Страница 37: ...peration checks Before using the machine read the instructions given in this manual and the concise instructions indicated on the platform plate Check the perfect integrity of the machine by sight che...

Страница 38: ...control panel The control panel is located on the platform The control panel is fixed to the front guard rail and is used to Turn the machine ON OFF Move the platform during ordinary working procedure...

Страница 39: ...ional joystick levers it is therefore possible to adjust movement speed by means of the relative controls To avoid sudden shakes during movements it is advisable to operate the proportional joystick c...

Страница 40: ...aneous drive steering orientation with platform lowered booms down telescopic boom retracted jib at a height from 10 and 70 is allowed in all three versions electric E electro diesel ED and four wheel...

Страница 41: ...l drive version RTD all platform position controls can be executed only individually whilst the turret orientation can be executed together with the drive and steering control with platform lowered bo...

Страница 42: ...booms down telescopic boom retracted jib at height from 10 to 70 only simultaneous drive steering turret orientation is allowed to help machine positioning in narrow places In machines with simultaneo...

Страница 43: ...se electric mains The 380V three phase electric pump for platform movement excepting drive and steering and the ground control panel is connected to three phase electric mains See next paragraphs for...

Страница 44: ...arge is at 20 only models E or ED with current continuous electrical pump In this condition lifting and telescopic boom extension are disabled Batteries should be immediately recharged 5 1 3 6 3 Diese...

Страница 45: ...alue to prevent increasing the overturn risk the operator on the platform is recommended to retract the telescopic boom first and to lower it as the last operation 5 1 3 6 5 Overload red warning light...

Страница 46: ...ontrol system and the platform audible alarm are automatically activated for 3 seconds or the whole time the operator remains trapped and or the Dead Man pedal is pressed The danger red light on the p...

Страница 47: ...activated except for the pantograph lowering and the telescopic retraction the current operation is immediately stopped and reversed Pantograph lowering Telescopic retraction and Cage Levelling Correc...

Страница 48: ...rameters working hours Diesel engine operational faults battery charger operation etc IT IS FORBIDDEN To use the ground control panel as a workstation when personnel is on the platform Use the ground...

Страница 49: ...led for emergency operations with locking key switch set to turret symbol Position with action to be kept When the key is released the machine is turned off Turn OFF the control circuits by turning it...

Страница 50: ...icating the operation of the battery charger for more detailed information read the paragraph Battery charge 5 2 7 Enabled control panel warning light G The green light is ON when the machine is turne...

Страница 51: ...rn clockwise turn the on off key on the ground control panel to Platform position remove the starting key and hand it over to a person in charge on ground properly informed of the use of the emergency...

Страница 52: ...petrol motors models EB use only Unleaded Petrol with Octane No 87 5 4 1 Diesel engine start up By turning the starter key on the platform control panel To 0 position the Diesel engine stops models D...

Страница 53: ...trol panel by means of the locking key switch located on the electric control unit on the chassis Unlock the push button R turning by a of turn clockwise Set the power selector M at platform to Electr...

Страница 54: ...ase by 90 To start the electric pump with the platform controls o Select the platform control panel with the locking key switch on the ground control unit o Unlock the push button R turning by a of tu...

Страница 55: ...ied out Press and hold down the dead man pedal as long as the desired operation has been carried out Operate the controls of the machine as indicated in previous paragraphs Fig 12 WARNING To start the...

Страница 56: ...e power emergency stop button if available E models and the machine power power circuit cut out is cut out To resume the operations is necessary On the platform control panel Turn the emergency stop b...

Страница 57: ...tely screw the knurled knob of the previously chosen actuator 4 Remove the operating lever of the manual pump and insert it on the pump itself 5 Activate the emergency pump 6 Check the correct executi...

Страница 58: ...in EU member countries On request the machine can be equipped with plugs and sockets in compliance with local standards or with particular needs Fig 14 Connect to the power mains having the following...

Страница 59: ...s according to the country where the machine is used Find out about the legislative limits concerning this operation from the bodies of Health and Safety at work It is absolutely forbidden to drive th...

Страница 60: ...n paragraph USE INSTRUCTION under paragraph Drive and steering for correct operation of drive controls During the loading operation following this system it is advisable to lift the jib if present see...

Страница 61: ...operation which must be carried out by qualified operators only After placing the machine onto the carrying vehicle fasten it by means of the same holes used for lifting To avoid breaking the platfor...

Страница 62: ...eduction gears Reposition the pin into the seats of the reduction gears in the reverse order Place the cover again and tighten the bolts Tow at a very slow speed remember that when the machine is bein...

Страница 63: ...e heat engine only when it is not running and sufficiently cool except for those operations such as oil change which must be performed when the motor is hot Risk of burns in contact with hot parts Do...

Страница 64: ...e paragraph Various adjustments Every year Check of drive reduction gear oil change Every year Drive circuit pressure relief valve adjustment and operation check Every year Operation check of movement...

Страница 65: ...s 8 Rotation reduction gear fixing screws 9 Elastic supports of heat engine For torque wrench setting refer to the table below Fig 18 TORQUE WRENCH SETTING S I thread normal pitch Class 8 8 8G 10 9 10...

Страница 66: ...remember to grease the articulated joints in the following cases After washing the machine Before using the machine again after a long time interval After using the machine in adverse environmental co...

Страница 67: ...f oil and quantity indicated in the table below HYDRAULIC SYSTEM OIL BRAND TYPE 20 C 79 C TYPE 30 C 48 C REQUIRED QUANTITY A16 JRTD A16 JED A16 JE A18 JRTD A18 JED A18 JE SYNTHETIC OILS 105 Litres ESS...

Страница 68: ...ashing procedure avoid air entering the system 7 2 3 5 Filling After washing fill the hydraulic circuit bleed and check the level Bear in mind that contact of fluid with the hydraulic pipes can cause...

Страница 69: ...ing the seal housings can cause greater leaks To prevent faults as well as avoid any negative effect on oil quality after the conversion it is best to filter the hydraulic system using a micro filtrat...

Страница 70: ...is equipped with a visual clogging indicator During normal operation the visual indicator is in the green zone When the indicator is in the red zone the filtering cartridge is to be replaced However t...

Страница 71: ...void sludge deposits the oil must be changed when the reduction gear is hot To change the oil unscrew cap B and place a container of a 2 litre capacity under it Drain the reduction gear completely cle...

Страница 72: ...ylinders of the oscillating axle Let the machine perform some travelling until the cylinder of the floating axle cylinders reaches against end stop several times and until you see oil flowing out of t...

Страница 73: ...ear The correct clearance between the blocks of the boom is 0 5 1 mm in case of higher clearance tighten the sliding blocks as follows Unscrew dowel A Screw the sliding block B using a cap seeger wren...

Страница 74: ...peration softly to check that the above mentioned solenoid valves have been disconnected properly the machine should not move Check the detected pressure value The correct value is indicated in the ch...

Страница 75: ...r in the special quick coupling 1 4 BSP D Using the ground control panel lift the machine up to the end stop Check the detected pressure value The correct value is indicated in the chapter Technical f...

Страница 76: ...braking valves is required In case of replacement of the hydraulic unit A In case of replacement of one or both braking valves C in a few cases only one valve is fitted To calibrate the braking valves...

Страница 77: ...ration according to the longitudinal axis generally X axis Using the platform control panel set the machine so as to place a shim of dimension A 10 mm under the two rear or front wheels see following...

Страница 78: ...78 MODELS SHIMS A16 JRTD A18 JRTD A16 JE A16 JED A18 JE A18 JED A mm 135 100 B mm 135 95 WARNING The dimensions of shims A and B refer to max allowed inclination as indicated in table TECHNICAL FEATU...

Страница 79: ...operation at least once a year The overload controller consists of Deformation transducer A load cell electronic board B for the system calibration located inside a tight case C in platform Operation...

Страница 80: ...tains electronic board switch on the machine With no load on the platform press and hold buttons 1 and 4 until the word CONS appears Press 4 to enter the CAP and 4 again to display the parameter value...

Страница 81: ...CARRY OUT ANY OPERATION THOUGH THE RED STEADY LED AND THE AUDIBLE ALARM SIGNAL THE DANGER CONDITION TURNING OFF THE MACHINE WILL RESET THE SYSTEM AND UPON STARTING THE OVERLOAD CONTROLLER OPERATES AGA...

Страница 82: ...higher than 10 according to the horizontal axis M1C activated The first drive speed is automatically activated if the chassis is inclined over the max allowed inclination Jib lifting and drive contro...

Страница 83: ...g the control circuits of the machine 7 3 3 Starter battery maintenance The starter battery does not require any special maintenance Keep terminals clean by removing any oxidation residues Check corre...

Страница 84: ...topping up device follow the instructions described in the battery user manual carefully 7 4 2 DRIVE battery maintenance For normal water operating conditions water topping up is to be carried out ev...

Страница 85: ...harger to the mains Use a cable of suitable section min 3x2 5 mm2 Do not use rolled up cables IT IS FORBIDDEN Connection to mains that do not comply with the above mentioned features Failure to comply...

Страница 86: ...on and the rated voltage of the battery Alarm flashing YELLOW Thermal probe Thermal probe is disconnected during charging or outside working range check probe connection and measure battery temperatur...

Страница 87: ...this manual were subject to the CE type test according to the Directive 2006 42 EC The certification was issued by Eurofins Product Testing Italy Srl 0477 Via Cuorgn 21 10156 Torino TO Italy Test carr...

Страница 88: ...ticker 1 029 10 022 SIMULTANEOUS CONTROLS MACHINES emergency manual lowering sticker 1 19 035 10 007 Safety belts coupling sticker 2 20 008 10 020 Triangle hot parts sticker 1 21 029 10 005 Fuel tank...

Страница 89: ...Use and Maintenance Manual A16 J A18 J Series Page 89...

Страница 90: ...that regard the life of the machine Periodic obligatory inspections under the care of the agency responsible for checking it in Italy ASL or ARPA Obligatory periodic inspections to verify the structur...

Страница 91: ...Use and Maintenance Manual A16 J A18 J Series Page 91 REQUIRED PERIODIC INSPECTIONS BY THE REGULATORY AGENCY Date Observations Signature Stamp...

Страница 92: ...pins on the structure DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR 4th YEAR 5th YEAR 6th YEAR 7th YEAR 8th YEAR 9th YEAR 10th YEAR DEFORMATION OF TUBES AND CABLES Most of all check at junc...

Страница 93: ...MARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR 4th YEAR 5th YEAR 6th YEAR 7th YEAR 8th YEAR 9th YEAR 10th YEAR GREASING See chapter 7 2 2 Monthly operation It is not necessary to indicate its execut...

Страница 94: ...s not necessary to indicate its execution every month but at least every year when the other operations are carried out DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR 4th YEAR 5th YEAR 6th YE...

Страница 95: ...VE CIRCUIT RELIEF PRESSURE VALVE See chapter 7 2 8 DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR 4th YEAR 5th YEAR 6th YEAR 7th YEAR 8th YEAR 9th YEAR 10th YEAR CALIBRATION CHECK OF MOVEMENT...

Страница 96: ...to indicate its execution every day but at least every year when the other operations are carried out DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR 4th YEAR 5th YEAR 6th YEAR 7th YEAR 8th YE...

Страница 97: ...O BE PERFORMED TOTAL OIL CHANGE IN HYDRAULIC TANK AND DRIVE REDUCTION GEARS EVERY TWO YEARS See chapter 7 2 3 and 7 2 5 DATE REMARKS SIGNATURE STAMP 2nd YEAR 4th YEAR 6th YEAR 8th YEAR 10th YEAR HYDRA...

Страница 98: ...PERIODIC INSPECTIONS BY THE OWNER CHECK DESCRIPTION OF OPERATIONS TO BE PERFORMED AIR PURGING FROM OSCILLATING AXLE CYLINDERS See chapter 7 2 6 DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR...

Страница 99: ...D INCLINOMETER OPERATION CHECK See chapter 7 2 11 DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR 4th YEAR 5th YEAR 6th YEAR 7th YEAR 8th YEAR 9th YEAR 10th YEAR EFFICIENCY CHECK OF PLATFORM O...

Страница 100: ...PERFORMED BRAKING SYSTEM EFFICIENCY CHECK See chapter 7 2 10 DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd YEAR 4th YEAR 5th YEAR 6th YEAR 7th YEAR 8th YEAR 9th YEAR 10th YEAR M1 MICROSWITCH OPER...

Страница 101: ...DIC INSPECTIONS BY THE OWNER SAFETY SYSTEM CHECK DESCRIPTION OF OPERATIONS TO BE PERFORMED STICKERS AND PLATES CHECK See Chapter 9 Check the legibility of the aluminium plate on the platform where the...

Страница 102: ...IODIC INSPECTIONS BY THE OWNER CHECK OF EMERGENCY DEVICES DESCRIPTION OF OPERATIONS TO BE PERFORMED MANUAL EMERGENCY LOWERING CHECK See chapter 5 6 DATE REMARKS SIGNATURE STAMP 1st YEAR 2nd YEAR 3rd Y...

Страница 103: ...al and functional features of this machine were in conformance with what was originally required and that any changes have been recorded in this Register THE SELLER THE PURCHASER SUBSEQUENT TRANSFERS...

Страница 104: ...RS OF OWNERSHIP COMPANY DATE We affirm that as of the date quoted above the technical dimensional and functional features of this machine were in conformance with what was originally required and that...

Страница 105: ...es Page 105 IMPORTANT BREAKDOWNS DATE DESCRIPTION OF BREAKDOWN SOLUTION SPARE PARTS USED DESCRIPTION CODE QUANTITY SERVICE SAFETY MANAGER DATE DESCRIPTION OF BREAKDOWN SOLUTION SPARE PARTS USED DESCRI...

Страница 106: ...es Page 106 IMPORTANT BREAKDOWNS DATE DESCRIPTION OF BREAKDOWN SOLUTION SPARE PARTS USED DESCRIPTION CODE QUANTITY SERVICE SAFETY MANAGER DATE DESCRIPTION OF BREAKDOWN SOLUTION SPARE PARTS USED DESCRI...

Страница 107: ...1 CNV sheath CNV sheath X X X X 029 08 128 Solenoid valve sheath CA1 CA1 electrovalves sheath X X X X X X 029 08 129 Sheath microswitches CA2 CA2 microswitches sheath X X 029 08 150 Sheath microswitch...

Страница 108: ...Use and Maintenance Manual A16 J A18 J Series Page 108 029 08 144...

Страница 109: ...Use and Maintenance Manual A16 J A18 J Series Page 109 029 08 149...

Страница 110: ...Use and Maintenance Manual A16 J A18 J Series Page 110 029 08 161...

Страница 111: ...Use and Maintenance Manual A16 J A18 J Series Page 111 029 08 171...

Страница 112: ...Use and Maintenance Manual A16 J A18 J Series Page 112 029 08 128...

Страница 113: ...Use and Maintenance Manual A16 J A18 J Series Page 113 029 08 129...

Страница 114: ...Use and Maintenance Manual A16 J A18 J Series Page 114 029 08 150...

Страница 115: ...Use and Maintenance Manual A16 J A18 J Series Page 115 029 08 132...

Страница 116: ...Use and Maintenance Manual A16 J A18 J Series Page 116 029 08 158...

Страница 117: ...Use and Maintenance Manual A16 J A18 J Series Page 117 029 08 148...

Страница 118: ...Use and Maintenance Manual A16 J A18 J Series Page 118 029 08 147...

Страница 119: ...Use and Maintenance Manual A16 J A18 J Series Page 119...

Страница 120: ...M ROTATION ACTUATOR 35 MANUAL PUMP 36 UNIDIRECTIONAL AND PRESSURE RELIEF VALVE M DIESEL ENGINE EP EMERGENCY ELECTRIC PUMP EV1 MOVEMENT PROPORTIONAL JOYSTICK CONTROL EV1T DRIVE PROPORTIONAL JOYSTICK CO...

Страница 121: ...Use and Maintenance Manual A16 J A18 J Series Page 121...

Страница 122: ...R 30 ELECTRO DIESEL APPLICATION 32 BY PASS SOLENOID VALVE 36 DIESEL ENGINE EV1 PROPORTIONAL JOYSTICK CONTROL EV2 FORWARD DRIVE SOLENOID VALVE EV3 BACKWARD DRIVE SOLENOID VALVE EV4 PANTOGRAPH LIFTING S...

Страница 123: ...Use and Maintenance Manual A16 J A18 J Series Page 123...

Страница 124: ...isant l objet de la pr sente d claration est conforme aux directives 2006 42 CE 2014 30 CE 2005 88 CE et au mod le certifi par Auf das sich die vorliegende Erkl rung bezieht den 2006 42 CE 2014 30 CE...

Страница 125: ...bjet de la pr sente d claration est conforme aux directives 2006 42 CE 2014 30 CE 2005 88 CE et au mod le certifi par Auf das sich die vorliegende Erkl rung bezieht den 2006 42 CE 2014 30 CE 2005 88 C...

Страница 126: ...bjet de la pr sente d claration est conforme aux directives 2006 42 CE 2014 30 CE 2005 88 CE et au mod le certifi par Auf das sich die vorliegende Erkl rung bezieht den 2006 42 CE 2014 30 CE 2005 88 C...

Страница 127: ...jet de la pr sente d claration est conforme aux directives 2006 42 CE 2014 30 CE 2005 88 CE et au mod le certifi par Auf das sich die vorliegende Erkl rung bezieht den 2006 42 CE 2014 30 CE 2005 88 CE...

Страница 128: ...bjet de la pr sente d claration est conforme aux directives 2006 42 CE 2014 30 CE 2005 88 CE et au mod le certifi par Auf das sich die vorliegende Erkl rung bezieht den 2006 42 CE 2014 30 CE 2005 88 C...

Страница 129: ...bjet de la pr sente d claration est conforme aux directives 2006 42 CE 2014 30 CE 2005 88 CE et au mod le certifi par Auf das sich die vorliegende Erkl rung bezieht den 2006 42 CE 2014 30 CE 2005 88 C...

Страница 130: ...Use and Maintenance Manual A16 J A18 J Series Page 130 TIGIEFFE S r l a socio unico Via Villa superiore 82 42045 Luzzara RE ITALY 39 0522 977365 39 0522 977015 WEB www airo com e mail info airo com...

Отзывы: