3 • Operation and Maintenance
Doc. 065330-05 03/2020
63
•
Load the SPE cartridges or disks.
•
Load the sample container rack.
3.8.3
Running the Method
•
Load the method.
•
Observe operation.
•
Press
CONT
to silence the end-of-run alarm.
3.8.4
After Running the Method
•
Based on recovery data and observations during operation, make any
necessary procedural changes, using the
METHODS
program option.
•
Remove the used cartridges or disks.
•
Prepare to run the next batch of samples by cleaning the sample lines
(see
•
If you are done for the day, clean up by emptying the waste
containers, flushing the solvent lines (see
the sample lines (see
3.9
Daily Operation Checklist
This section presents an overview of the key elements of routine operation.
3.9.1
Preparing the System
•
Turn on the system.
•
Turn on and check the gas supply. Set the gauge, if applicable.
•
Check the liquid level in the solvent reservoirs and fill as needed.
•
Check the waste containers and empty as needed.
•
Prime the solvent lines.
•
Load the elution rack.
•
(Optional) Clean the SPE cartridges or disks.
•
Load the SPE cartridges or disks.
Содержание Dionex AutoTrace 280
Страница 1: ...Dionex AutoTrace 280 SPE Instrument Operator s Manual Document No 065330 Revision 05 March 2020...
Страница 86: ...Dionex AutoTrace 280 Operator s Manual 78 Doc 065330 05 03 2020...
Страница 134: ...Dionex AutoTrace 280 Operator s Manual 126 Doc 065330 05 03 2020...
Страница 158: ...Dionex AutoTrace 280 Operator s Manual 150 Doc 065330 05 03 2020...