5 • Service
Doc. 065330-05 03/2020
105
Getting Started
Before removing the pump, follow the steps below to create and run a method that
will dry the line that runs from the pump to the switching valve. This prevents
leaking during the pump replacement.
1. In the AutoTrace software main window, click
Methods
. The Set Up Methods
window opens.
2. On the Set Up Methods window toolbar, click
New
.
3. In the
Name
box, enter
Dry Lines
as the method name.
4. Click the
Edit
button.
5. Under
AutoTrace Method Step
, expand the
Solid-Phase Extract
option to
display the SPE commands.
6. Double-click the
Load Sample
command and set the volume to
10.0
mL.
7. Double-click the
Dry with Gas
command and set the time to
0.5
min.
8. To save the method, click
Save
on the toolbar.
9. On the toolbar, click the down arrow next to
Command
and select
Download
Method
.
10. If the Set Up Methods window is not currently open, the Find Method
window opens. Double-click
Dry Lines,
the name of the method you want to
download.
11. When asked to confirm that you want to download the method to the Dionex
AutoTrace 280, click
Yes
.
12. Place the sample lines in an empty, clean container.
13. Run the Dry Lines method.
14. When the method has finished running, turn off the Dionex AutoTrace 280
power switch and disconnect the power cord from both its source and from
the Dionex AutoTrace 280 right-side panel.
HIGH VOLTAGE—Disconnect the main power cord from its source, as
well as from the right-side panel of the Dionex AutoTrace 280.
Содержание Dionex AutoTrace 280
Страница 1: ...Dionex AutoTrace 280 SPE Instrument Operator s Manual Document No 065330 Revision 05 March 2020...
Страница 86: ...Dionex AutoTrace 280 Operator s Manual 78 Doc 065330 05 03 2020...
Страница 134: ...Dionex AutoTrace 280 Operator s Manual 126 Doc 065330 05 03 2020...
Страница 158: ...Dionex AutoTrace 280 Operator s Manual 150 Doc 065330 05 03 2020...