Y-8
Y-8
Operation Check (Crane Operation)
46
WY05-2492E
3. Jib
1. Automatic stop by two-blocking must not occur
while the jib set status is registered.
2. Check the pin A insertion.
• When the set pin is removed from part B, the
icon must appear.
• Check that the icon disappears when set pin is
inserted into part C and the boom is extended.
3. Check the jib drop prevention function.
Condition: Jib set status is registered.
• While the boom angle is less than 75°, the boom
cannot be extended with the pin A inserted and
the set pin not inserted in the part B.
IWY05-014021
Содержание GR-130EX
Страница 1: ......
Страница 8: ...7 WA04 5470E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 27: ...Y 2 Y 2 Adjusting Pressure Hydraulic Pressure 14 WY02 2090E ...
Страница 150: ...Z 14 WZ03 4392E View System Z 14 Z 14 78 78 0 343 812 73200 5 Cable A IWZ03 439201E ...
Страница 151: ...Z 14 WZ03 4392E View System Z 14 Z 14 79 79 0 343 818 71200 6 Cable B IWZ03 439202E ...