Y-5
Y-5
Adjusting Procedure (Electric)
32
WY04-2470E
4. Jib connection pin detection switch
(CN549)
1. Change the installing position of the detector
switch roller lever as shown in the figure below.
2. Apply thread locking agent (ThreeBond 1401 or
equivalent) to the threaded section of the detector
switch.
3. Stow the jib.
4. Make sure that the detector switch works when
the connection pin is inserted.
Switch fixing bolt tightening torque:
4.9 to 5.9 N-m (50 to 60 kgf-cm) (3.6 to 4.3 ft-lbf)
△
5
343-537-92000
Содержание GR-130EX
Страница 1: ......
Страница 8: ...7 WA04 5470E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 27: ...Y 2 Y 2 Adjusting Pressure Hydraulic Pressure 14 WY02 2090E ...
Страница 150: ...Z 14 WZ03 4392E View System Z 14 Z 14 78 78 0 343 812 73200 5 Cable A IWZ03 439201E ...
Страница 151: ...Z 14 WZ03 4392E View System Z 14 Z 14 79 79 0 343 818 71200 6 Cable B IWZ03 439202E ...