41
41
Z-10
IWZ02-4392E03a
WZ02-7530E
Electric Parts Location Diagram (Upper)
4. Pressure switch installation diagram
Z-10
Z-10
2
343-624-53000
c
f
d
a
b
j
i
h
e
g
a
h
b
i
c
j
d
e
f
ON
ON
OFF
ON
ON
OFF
OFF
ON
ON
Left detection
Right detection
Extending detection
Hoisting down detection
ON
ON
OFF
Retracting detection
ON
ON
OFF
Slewing
ON
ON
OFF
Hoisting up detection
Main winch
ON-OFF indicates energization condition of contact point.
Switch operating list
ON
OFF
ON
ON
OFF
ON
ON
ON
OFF
Lowering detection
Raising detection
Hoisting up detection
ON
OFF
ON
Di14+
Di13+
Di12+
Di17+
Di18+
Di9+
Di10+
Di15+
Di11+
Di16+
Hoisting down detection
Neutral Push
Pull
Lever operation
Note
Elevation
Telescoping
Aux. winch
Switch name
g
c
Tilt raising detection
Tilt lowering detection
ON
OFF
ON
ON
OFF
Jib tilt
ON
Di13+
Di14+
j
Pressure switch installation diagram
Elevation [Main winch]
Main winch [Aux. winch]
Aux. winch [Telescoping/jib tilt]
Remote control valve
Slewing right detection switch
CN540
Main winch hoisting up detection switch
CN532
Aux. winch hoisting up detection switch
CN533
Boom retracting/jib tilt raising detection switch
CN535
Boom raising detection switch
CN536
Telescoping/jib tilt [Elevation]
Slewing
Boom lowering detection switch
CN537
Main winch hoisting down detection switch
CN546
Boom extending/jib tilt lowering detection switch
CN534
Aux. winch hoisting down detection switch
CN547
Slewing left detection switch
CN541
[ ] indicate TADANO layout on Remote control valve arrangement.
Содержание GR-130EX
Страница 1: ......
Страница 8: ...7 WA04 5470E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 27: ...Y 2 Y 2 Adjusting Pressure Hydraulic Pressure 14 WY02 2090E ...
Страница 150: ...Z 14 WZ03 4392E View System Z 14 Z 14 78 78 0 343 812 73200 5 Cable A IWZ03 439201E ...
Страница 151: ...Z 14 WZ03 4392E View System Z 14 Z 14 79 79 0 343 818 71200 6 Cable B IWZ03 439202E ...