Z- 14
WZ03-4392E
View System
Z- 14
Z- 14
73
73
3
343-820-12000
1
343-820-01000
Z-14 View System
Follow main harness
Controller (power box)
for Front left camera (connect to CAMERA3)
Cable A
Main harness
Cable B: between Controller (power box) and Display
Display
Apply screw locking compound
(ThreeBond 1401 or equivalent)
Tightening torque: 1.2 ± 0.1 N-m
(12 ± 1 kgf-cm) (0.9 ± 0.07 ft-lbf)
View D
for Back camera
for Drum camera
for Front left camera
Harmess A
Controller
(power box)
Connector without indication do not need to connect
6 pole female (for power supply select, without setting)
for select power supply of 2 screen controller and tuner
6 pole female (for lifted load monitoring camera, without setting)
8 pole male
6 pole male
5 pole female (for TV tuner)
Main harness
Detail of Controller (power box)
Insulate each plug with tape
CN838
CN839
View A
(Rotated diagram)
Detail C
Detail B
Do not fix around
the cable bending.
Tightening torque approx. 2.5 N-m
(25 kgf-cm) (1.84 ft-lbf)
Connector
Front left camera
Support
Tightening torque 1 ± 0.1 N-m
(10 ± 1 kgf-cm) (0.74 ± 0.07 ft-lbf)
Bolt provided with camera
Slit up and use
Installation procedures of Camera
1. Remove the camera from the support provided with camera.
2. Set the camera on the support, put the provided insulaion plate
on the right and the left, and fix with the provided bolt.
IWZ03-4392E01
Cable B
1. System configuration
Содержание GR-130EX
Страница 1: ......
Страница 8: ...7 WA04 5470E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 27: ...Y 2 Y 2 Adjusting Pressure Hydraulic Pressure 14 WY02 2090E ...
Страница 150: ...Z 14 WZ03 4392E View System Z 14 Z 14 78 78 0 343 812 73200 5 Cable A IWZ03 439201E ...
Страница 151: ...Z 14 WZ03 4392E View System Z 14 Z 14 79 79 0 343 818 71200 6 Cable B IWZ03 439202E ...