Y-6
Y-6
Assembly Adjustment (Crane Operation)
37
WY05-5150E
3. Evenly tighten the adjustment nuts C (2 points) at the threaded end of the top boom section extension wire
rope until the top boom section is slightly (1 to 5 mm (0.04 to 0.2 in)) away from the 5th boom section.
For extending top boom section /retracting 5th boom section
Содержание GR-130EX
Страница 1: ......
Страница 8: ...7 WA04 5470E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 27: ...Y 2 Y 2 Adjusting Pressure Hydraulic Pressure 14 WY02 2090E ...
Страница 150: ...Z 14 WZ03 4392E View System Z 14 Z 14 78 78 0 343 812 73200 5 Cable A IWZ03 439201E ...
Страница 151: ...Z 14 WZ03 4392E View System Z 14 Z 14 79 79 0 343 818 71200 6 Cable B IWZ03 439202E ...