Y-5
Y-5
Adjusting Procedure (Electric)
30
WY04-2470E
Y-5 Adjusting Procedure
(Electric)
1. 2nd/3rd boom full retraction detection
switch (CN553)
1. Adjust so that the switch turns OFF at the position
when the No. 1 telescoping cylinder is extended
5 mm (0.2 in).
2. After adjusting, apply thread locking agent
(ThreeBond 1401 or equivalent) to the nut and
tighten it.
2. 4th/top boom full retraction detection
switch (CN859)
Adjust the switch position so that its contact is
shifted (opened/closed) when the top boom
section is extended/retracted to the position where
it is 5 to 8 mm (0.2 to 0.31 in) longer than its fully
retracted length.
Switch fixing bolt tightening torque:
4.9 to 5.9 N-m (50 to 60 kgf-cm) (3.6 to 4.3 ft-lbf)
△
9
343-624-52000
△
9
343-624-52000
Содержание GR-130EX
Страница 1: ......
Страница 8: ...7 WA04 5470E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 27: ...Y 2 Y 2 Adjusting Pressure Hydraulic Pressure 14 WY02 2090E ...
Страница 150: ...Z 14 WZ03 4392E View System Z 14 Z 14 78 78 0 343 812 73200 5 Cable A IWZ03 439201E ...
Страница 151: ...Z 14 WZ03 4392E View System Z 14 Z 14 79 79 0 343 818 71200 6 Cable B IWZ03 439202E ...