Y-5
Y-5
Adjusting Procedure (Electric)
31
WY04-2470E
3. Jib lock pin detection switch (CN572)
1. Apply thread locking agent (ThreeBond 1401 or
equivalent) to the threaded section of the detector
switch.
2. Stow the jib.
3. Adjust the clearance from the detector switch and
fix the switch using nuts.
Nut tightening torque:
40 to 50 N-m (410 to 510 kgf-cm)
(29.5 to 36.9 ft-lbf)
4. Make sure that the red LED on the detection
switch lights up when the switch is activated.
△
5
343-537-92000
Содержание GR-130EX
Страница 1: ......
Страница 8: ...7 WA04 5470E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 27: ...Y 2 Y 2 Adjusting Pressure Hydraulic Pressure 14 WY02 2090E ...
Страница 150: ...Z 14 WZ03 4392E View System Z 14 Z 14 78 78 0 343 812 73200 5 Cable A IWZ03 439201E ...
Страница 151: ...Z 14 WZ03 4392E View System Z 14 Z 14 79 79 0 343 818 71200 6 Cable B IWZ03 439202E ...