Manual Transmission: 5B-5
• Install the gearshift fork shafts (3) and gearshift forks
(4).
• Tighten the shift fork retainer plug (5) to the specified
torque.
CAUTION
!
Replace the gasket (6) with a new one.
Tightening torque
Gearshift fork retainer plug (a): 35 N·m (3.5 kgf-
m, 25.5 lb-ft)
• Apply thread lock to the screws and tighten them.
: Thread lock cement 99000–32030
(THREAD LOCK CEMENT SUPER 1303 or
equivalent)
Countershaft Assembly
• Install the bearing pin (1) and C-ring (2).
• Install the countershaft on the upper crankcase.
NOTE
Align the C-ring with the groove of the
bearing and bearing pin with the indent on
the bearing.
• Turn the bearing to install the bearing dowel pin “A” in
the respective position.
3
4
3
4
4
I822H1520012-01
(a)
5
6
I822H1520013-01
I822H1520014-01
1
2
I822H1520015-01
I822H1520016-02
“A”
I822H1520017-01
Содержание VLR1800
Страница 4: ......
Страница 64: ...0C 12 Service Data...
Страница 456: ...2D 22 Wheels and Tires...
Страница 489: ...Drive Chain Drive Train Drive Shaft 3A 31 09951 17010 Bearing installer Page 3A 19...
Страница 490: ...3A 32 Drive Chain Drive Train Drive Shaft...
Страница 580: ...6B 11 Steering Handlebar...
Страница 623: ...Prepared by January 2008 Part No 99500 39360 01E Printed in Japan 624...