1A-55 Engine General Information and Diagnosis:
P0110-L (Use of SDS)
Step
Action
Yes
No
1
1) Turn the ignition switch OFF.
2) Remove the fuel tank. Refer to “Fuel Tank Removal and
Installation in Section 1G (Page 1G-8)”.
3) Check the IAT sensor coupler (1) for loose or poor
contacts.
If OK, then check the IAT sensor lead wire continuity.
4) Disconnect the IAT sensor coupler.
5) Check the continuity between the Dg wire and ground. If
the sound is not heard from the tester, the circuit
condition is OK.
Special tool
(A): 09900–25008 (Multi-circuit tester set)
Tester knob indication
Continuity (
)
6) Connect the IAT sensor coupler.
7) Turn the ignition switch ON.
8) Insert the needle pointed probes to the lead wire coupler.
Go to Step 2.
• Dg wire shorted to
ground.
• If wire is OK, go to
Step 2.
1
I822H1110042-01
(A)
I822H1110043-01
Содержание VLR1800
Страница 4: ......
Страница 64: ...0C 12 Service Data...
Страница 456: ...2D 22 Wheels and Tires...
Страница 489: ...Drive Chain Drive Train Drive Shaft 3A 31 09951 17010 Bearing installer Page 3A 19...
Страница 490: ...3A 32 Drive Chain Drive Train Drive Shaft...
Страница 580: ...6B 11 Steering Handlebar...
Страница 623: ...Prepared by January 2008 Part No 99500 39360 01E Printed in Japan 624...