1D-9 Engine Mechanical:
Throttle Body Construction
B822H11406041
RH
RH
LH
LH
Front cylinder
Front cylinder
Intake pipe clamp
Rear cylinder
Rear cylinder
Air cleaner outlet clamp
“C”
“ a ”
“ b ”
“ c ”
“C”
“A”
“A”
1
“C”
2
“D”
“B”
3
4
1
“C”
“C”
5
“C”
“B”
3
“C”
“E”
I822H1140329-04
1. Canister (E-33 only)
“A”: Yellow mark
“a”: 15 – 25
°
2. Canister purge valve (E-33 only)
“B”: White mark
“b”: 25 – 35
°
3. Purge hose (E-33 only)
“C”: Face the tip of the clip to upper.
“c”: 15
°
4. O2 sensor read wire coupler (E-02, 19, 24, 33)
“D”: Face the tip of the clip to lower.
5. PCV hose
“E”: Face the tip of the clip to the throttle valve.
Содержание VLR1800
Страница 4: ......
Страница 64: ...0C 12 Service Data...
Страница 456: ...2D 22 Wheels and Tires...
Страница 489: ...Drive Chain Drive Train Drive Shaft 3A 31 09951 17010 Bearing installer Page 3A 19...
Страница 490: ...3A 32 Drive Chain Drive Train Drive Shaft...
Страница 580: ...6B 11 Steering Handlebar...
Страница 623: ...Prepared by January 2008 Part No 99500 39360 01E Printed in Japan 624...