1J-10 Charging System:
6) After confirming that the electrolyte has entered the
battery completely, remove the electrolyte containers
from the battery.
7) Wait for about 20 minutes.
8) Insert the caps (2) into the filler holes, pressing in
firmly so that the top of the caps do not protrude
above the upper surface of the battery’s top cover.
CAUTION
!
• Once the caps are installed to the battery,
do not remove the caps.
• Do not tap the caps with a hammer when
installing them.
Charging
For initial charging, use the charger specially designed
for MF battery.
CAUTION
!
• For charging the battery, make sure to use
the charger specially designed for MF
battery. Otherwise, the battery may be
overcharged resulting in shortened service
life.
• Do not remove the cap during charging.
• Position the battery with the cap facing
upward during charging.
Battery Recharging
CAUTION
!
Do not remove the caps on the battery top
while recharging.
NOTE
When the motorcycle is not used for a long
period, check the battery every 1 month to
prevent the battery discharge.
1) Remove the battery from the motorcycle. Refer to
“Battery / Battery Holder Removal and Installation
(Page 1J-11)”.
2) Measure the battery voltage using the multi-circuit
tester.
If the voltage reading is less than the 12 V (DC),
recharge the battery with a battery charger.
Recharging time
1.8 A for 5 to 10 hours or 9 A for 1 hour
CAUTION
!
Be careful not to permit the charging current
to exceed 9 A at any time.
2
I718H11A0027-01
Correct
Incorrect
I649G11A0047-02
Содержание VLR1800
Страница 4: ......
Страница 64: ...0C 12 Service Data...
Страница 456: ...2D 22 Wheels and Tires...
Страница 489: ...Drive Chain Drive Train Drive Shaft 3A 31 09951 17010 Bearing installer Page 3A 19...
Страница 490: ...3A 32 Drive Chain Drive Train Drive Shaft...
Страница 580: ...6B 11 Steering Handlebar...
Страница 623: ...Prepared by January 2008 Part No 99500 39360 01E Printed in Japan 624...